1 These Rooms Are In Very Poor Condition And Should Be Adapted To The Planned Functionality - Including Increasing Height. A Poor Technical Condition Is Necessary To Adapt These Rooms To Applicable Teaching Standards And Regulations (Sanitary Sanitary Sausages, Haccp, Fire Protection, Health And Safety. Disabled. There Is A Threat That External Controls Including Sanitary, Fire Protection. Will Order Them To Be Closed. The Principles And Requirements Of Health And Safety In The Gastronomy Industry Can Be Considered One Of The Strictest. The Task Includes: Renovation/Reconstruction And Electrical Installations, Sanitary Installations, Ventilation, Height Increase. The Rooms Including Their Arrangement Do Not Allow Practical Exercises To Be Carried Out, Which Requires The Programming Base For Education In The Profession. Hence The Urgent Need To Modernize Them. The Need Is Also Due To The Development Plans Of Schools In Response To The Demand Of The Regional Labor Market. Young People Will Be Educated There In The Professions Sought On The Labor Market. B) The Investment Also Includes The Expansion Of The Zsae Building With An External Elevator, Which Will Provide Access In Particular Os. Physically Disabled To The Higher Floors Of The School. It Is Planned, Among Others: Replacement Of Radiators, Bathroom Renovation, Replacement Of Floors, Inside, Ventilation And Air Conditioning, Renovation Of The Electrical Installation, Insulation Of The Ceiling. 3) New Elevator In The Poviat Starosty In Kolbuszowa: In The Building Of The Poviat Eldership, It Is Necessary To Replace The Passenger Crane Because It Is Already Very Well Exposed, Frequent Failures Disabled In The Office Of The Office Of The Office. Design Non -Performance Or Improper Performance Of The Subject Of The Contract, H) The Conditions Of The Construction Site, Electrical Lines And Other, Cables, Pipes, Departing Cables Significantly From The Tender Documentation, Project Documentation, In Particular Encountering Non -Inventarized Networks, Installations Or Other Building Objects, And) Correct Performance Of The Subject Of The Contract Whose Implementation Will Cause A Change In The Material Scope Of The Basic Order (E.G. Materials, Technology. The Employer Reserves The Right To Not Realize The Full Scope Of Works, If It Could Not Be Foreseen At The Time Of The Conclusion Of The Contract, Not The Contracting Authority Or The Contractor, Without Any Negative Legal And Financial Effects. In This Case, The Contractors Remuneration Will Be Reduced, While The Contracting Authority Will Pay For All Fulfilled Benefits And Documented Costs That The Contractor Incurred In Connection With The Planned Benefits Resulting From The Contract. 1. The Employer Allows The Change Of Remuneration In The Case Of: 1) Reduction Of The Scope Of Works. The Contractors Remuneration Will Be Properly Reduced By The Value Of Works, By Which The Scope Of The Subject Of The Contract Was Reduced. The Value Of These Works
|