2. The Subject Of The Order Is Delivery, Mounting On The Chassis/Trailer And Starting The Power Generator. 2.1. The Subject Of The Contract Is In Particular The Performance By The Contractor: A) Delivery And Assembly Of The Set, B) Correct Connection Of The Set To The Existing Installation Of The Ordering Party, C) Performing Grounding And All Necessary Assembly Works Allowing The Use Of The Set For Its Intended Purpose, D) Obtaining All Necessary Administrative Decisions If Required, Approval And Permits That The Ordering Party Must Have A Set In The Given Given Location, E) Adjustment Of Settings And Optimization Of The Set Parameters Of The Set, F) Starting And Trial Start Of The Set (The Deadline Must Be In Writing, Previously Agreed With The Contracting Authority), G) Providing One Copy Of The Assembly Instructions, User Manual And Instructions For The Failure Of The Set In Paper Form And One Copy In Electronic Form, H) Providing The Service Service By The Period Scope Related To The Normal Operation Of The Set In Accordance With Technical And Movement Documentation (Dtr) And Service In The Event Of A Failure, 2.2. Aggregate With A Autostart Function With Szr Automation And The Possibility Of Manual Work - Parameters: A) Aggregate Building - Atmospheric, Adapted To Use Outside, Resistant To Weather Conditions Such As Rain, Snow, Icing, Strong Sunlight. B) Type Of Aggregate-Transple, 400/230 V, 50 Hz, Cos Φ = 0.8 With A Voltage Stability +-1%C) Aggregate Power Minimum: Maximum Power Esp 88.0 Kva / 70.0 Kw,-Rated Power Prp: 80.0 Kva / 64.0 Kwd). With A Minimum Capacity Of 150 Liters Or Providing Working Time At A Load Of 80 Percent On A Full Tank Of A Minimum Of 8 Hours Of Continuous Operation (During The Final Transfer, The Tank Must Be Filled At Least In 75 Percent) G) Adapted To Continuous Operation At A Variable Load, H) The System Of The Aggregate Autostart, With The Disappearance Of Network Voltage In The Office Building As Well As The Possibility Of Switching The Aggregate To Manual Work For The Needs Of The Second Building, And The Set (In This Aggregate) Must Be Factory New, The Year. 2024 - Muted Version.J) The Aggregate Is To Meet The Standards: Iso 9001: 2015, Electromagnetic Directive 2014/30/Eu, Low Department Directive 2014/35/Eu, H Look -Lockable, Integrated Battery Charger, Engine Block Heating System, Connection Sockets Outlined Outside The Housing.L) Computer (Controller) Enabling Control Of Min. : Temperatures, Engine Speed, Operating Time, Fuel Tank, Engine Temperature, Power Consumed, Voltage. M) Approved Trailer Adapted To The Aggregate With Adjustable Supports.N) The Contracting Authority Allows The Automatic And Manual Power Switch With 125 A (Instead Of 160A). 2.3 Installation And Installation: A) The Placement Of The Aggregate (Trailer) At The Wall Of The Main Building (Rear Entrance) At A Distance Of About 20 M From The Location Of The Main Switchgear (Front Of The Building). As Part Of The Task, The Contractor Is O
|