Construction Work - “Reduction Of Nsps Energy Intensity Prievidza Based In Bojnice” 2.. The Subject Of The Contract Is Addressed By The Construction Modifications Of The Individual Pavilions Of The Hospital With A Polyclinic In Order To Reduce The Energy Intensity And Operation In Terms Of Saving The Energy Of Individual Buildings. It Is Mainly A Comprehensive Design Of The Insulation Of The Perimeter Walls Of Buildings, Thermal Insulation Of Roof Structures, Comprehensive Replacement Of Holes In The Perimeter Walls - Windows And Doors Of Individual Pavilions, Partial Reconstruction Of The Heating Of Individual Solved Buildings And Implementation Of New So -Called. Green Technologies Such As Heat Pump Technology, Photovoltaic Panel Technology. The Current Area Of The Hospital With A Policlinic In Prievidza Based In Bojnice Was Built At The End Of The 1950S And Put Into Use In The Early Sixties. , Primary Architectural Design And Used Architectural Style Of The Main Buildings Of The Area Bears The Signs Of So -Called. Socialist Realism, Which Is Typical Of The Time When The Buildings Were Designed And Is Multiplied In The Architectural Design Of The Towns Of Upper Nitra. Project Documentation Processes The Buildings In The Following Order: • Entrance Building (Hospital And Pharmacy Directorate) • Monoblock (Main Medical Facility Of The Hospital, Outpatient Clinic, Bed Part) • Psychiatric Pavilion (Separate Building Within The Hospital Area) Central Kotolna Photovoltaic Facility With Storage (So02+So03) Especially In Relation To The Costs Associated With The Preparation Of Heat And Energy Necessary For Heat Production, And The Emphasis Is On The Preservation Of The Original Architectural Design Of The Architectural Style Of Individual Objects, Especially The Monoblock Building. By Implementing Repairs And Insulation Of Facades And Roofs Of Individual Buildings, Replacement Of Fillings Of Facades And Reconstruction Of Heating Will Not Change The Function Of Using The Building, Changes In The Spatial Character Of The Building And The Change Of Built -Up Area. Similarly, The Ratios Of Collision Water Capture From Roofs That Are Lifted Into The Rain Sewerage Area Of The Hospital Area Will Not Be Changed. Construction, Individual Buildings Will Continue To Serve After Completion For The Purposes Of The Hospital With A Polyclinic. Functional Use And Purpose For Which They Were Built Will Not Be Changed In Individual Objects. The Reconstruction Of The Buildings Will Not Change The Property Relations To The Objects. The Structure Of The Construction Will Be Divided Into Individual Construction Objects So 01 - Monobklok, Designation Within The Hospital Area Building And So 02 - Entrance To So 03 - Psychiatric Pavilion Central Kotolna Photovoltaic Facility With Storage (So02+So03) In Terms Of Extent And Type Of Planned Work Reconstruction Of The Buildings. Coordination. The Scope And Type Of Construction Work Is The Same For All Solved Objects In The Project. Construction Work Can Be Realized So That It Will Not Be Necessary To Interrupt Operation In Individual Buildings, Especially Operation In The So 01 - Monoblo Building
Contact Information
Address
K dolnej stanici 20A
Contact No.
+421903012014
Email
gaslub@hotmail.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94441140
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.