Tender For New Construction In Nabard Scheme Of Isara To Kamalpur Mai Road In Fy 2024-25 - Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2as per Technical Specification Clause 303.1 I/C cost of material, labour, T&P and all Taxes but Excluding GST 2 Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material. I/C cost of material, labour, T&P and all Taxes but Excluding GST 3 W B M Grade-2 Providing Laying Spreading and Compacting Stone aggregates of specific sizes to water bound macadem specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregates, watering and compacting to the required density grading 2 as per Technical Clause 405(2) I/C cost of material, labour, T&P and all Taxes but Excluding GST 4 WBM Grading 3 (using Graded Metal) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification includingspreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. I/C cost of material, labour, T&P and all Taxes but Excluding GST 5 Primer Coat :- Providing and applying primer coat with bitumen emulsion (SS-2) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70kg/sqm using mechincal means as per technical specification Clause 502. I/C cost of material, labour, T&P and all Taxes but Excluding GST 6 Tack Coat :- Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. I/C cost of material, labour, T&P and all Taxes but Excluding GST 7 20mm thick Open-Graded Premix Carpet using Bituminous Binder :- 20mm thick Open-Graded Premix Carpet using Bituminous (VG-10) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregatesusingbitumen (VG-10) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508 I/C cost of material, labour, T&P and all Taxes but Excluding GST 8 Seal Coat:- Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. I/C cost of material, labour, T&P and all Taxes but Excluding GST 9 Brick edging on both side of the road of M-150 bricks 8cm. (3") wide and 12cm (4½") deep laid with mud mortar including all labour and supply of brick finished to required template & ramming the excavated earth as directed by the Engineer-In-Charge. SOR SI No. 765 I/C cost of material, labour, T&P and all Taxes but Excluding GST 10 Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (MORD 9.1 (1100&300) I/C cost of material, labour, T&P and all Taxes but Excluding GST 11 Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Coarse sand : 8 graded stone aggregate 40 mm nominal size) including supply of all materials, labours and T&P etc. required for proper completion of the work. In Foundation and floors. I/C cost of material, labour, T&P and all Taxes but Excluding GST 12 Providingand laying of40 mm gauge B/B under Hume pipe culvert foundation in road workincluding all materials, labours, T&P etc. required for completion of the work I/C cost of material, labour, T&P and all Taxes but Excluding GST 13 Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. (Coarse Sand not less than 2.25 FM) . I/C cost of material, labour, T&P and all Taxes but Excluding GST 14 Supply, laying and fixing of 350mm DiaNP3 class hume pipes in proper position in culvert. I/C cost of material, labour, T&P and all Taxes but Excluding GST 15 Supply, laying and fixing of 600mm Dia NP3 class hume pipes in proper position in culvert. I/C cost of material, labour, T&P and all Taxes but Excluding GST 16 Ruled Pointing on brick work with cement mortar 1:3 (1Cement : 3 Fine Sand) I/C cost of material, labour, T&P and all Taxes but Excluding GST 17 12 mm cement plaster on brick work with cement mortar of mix (All floors). (I) 1:3 (1 cement : 3 coarse sand) I/C cost of material, labour, T&P and all Taxes but Excluding GST 18 White washing with lime on undecorated wall surfaces (Two coats) to give an even shade including thoroughly brooming the surface to remove all dirt, dust mortar drops and loose scales of lime wash and other foreign matters I/C cost of material, labour, T&P and all Taxes but Excluding GST 19 S/F of Kilometer Stone Lettering, Painting etc Complete as per direction of Engineer incharge I/Ccost of material, labour, T&P and all Taxes but Excluding GST 20 S/F of Hectometer Stone Lettering, Painting etc Complete as per direction of Engineer incharge I/Ccost of material, labour, T&P and all Taxes but Excluding GST 21 Supply and Fixing Sign Board as per direction of Engineer incharge I/C cost of material, labour, T&P and all Taxes but Excluding GST 22 Maintenance Charges for Bituminous Road PartMaintenance Charge including repair of painted surface, earthwork on patri etc complete as per direction of E.I. for the period of five years from the actual date of completion of work.For First Year @ Zeero % 23 Maintenance Same as Item No. 22 but for Second Year 0.75% of cost of total executed Work 24 Maintenance Same as Item No. 22 but for Third Year 1.50% of cost of total executed Work 25 Maintenance Same as Item No. 22 but for Fourth Year 2.25% of cost of total executed Work 26 Maintenance Same as Item No. 22 but for Fifth Year 3.00% of cost of total executed Work
|