Tender For New Construction Work Of Dhanu Connecting Road From Faguiya Nadra Road - Construction of Embankment with Material Obtained from R.O.W. Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 2 Construction ofgranular Sub-baseby providing well graded material , spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel rollerto achieve the desired density, complete as perTechincal Specificationclause 401(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 3 Providing, laying, spreading and compacting stone aggregates of specific sizes (45-63 mm)to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. WBM Grading-2 as per Technical specification Clause 405(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 4 Providing, laying, spreading and compacting stone aggregates of specific sizes (22.4-53mm)to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. WBM Gradeing-3as per Technical Specification Clause 405(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 5 Brick edging on both side of road with first class brick 8 cm wide and 12 cm deep laid with mud mortar including all materials, labour T&P etc. complete.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 6 Providing and applying primer coat with bitumen emulsion (SS-II) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per sqm using mechanical means as per Technical Specification Clause 502.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 7 Providing and applying tack coat with Bitumen (VG-10) usingbitumen distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom and Air compresser as per Technical Specification Clause 503 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 8 Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm -11.2 mm aggregates using penetration grade bitumen VG-10to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant,laying and rolling with three wheel static roller80-100 KN capacity ,finished to required level and grades to be follwed by seal coat of Type -C as per Technical Specification Clause 508.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 9 Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall usingType C as per Technical Specification Clause 510(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 10 Construction of Subgrade and earthen shoulders with approved material obtained from R.O.W. with all lift and leads, transporting to site, spresding grading to reqiire slope and compacted to meet requirement of Tables 300.2 as per Technical Specification Clause 303.1 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 11 Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with equirements of lines, grades and cross-section, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical specification Clause 302.3 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 12 Concrete with 4cm. gauge approved stone ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials labour and tools and plants etc. required for proper completion for the work. as Per SOR No-280 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 13 Cement concrete with 4cm. gauge approved stone ballast, approve coarse sand and cement in the proportion of 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. as per SOR No-279(b)(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 14 Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. 1300(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 15 Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 16 Struck pointing with cement mortar consisting 1 part cement and 2 parts of sand of 1.25 fineness modulus including supply of all materials labour and T&P etc. required for proper completion of the work. as per SOR No-574(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 17 R.C.C. grade M-25- Providing and laying reinforced cement concrete in super stuctture as per drawing and technical specification clause no-800,1205.4 abd 1205.5(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 18 Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications No-1000 & 1200(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 19 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm wit smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall return wall to the full height compacted to firm condition complete as per drawing and technical specification clauses 1204.3.8 (Excluding cost of materialsAs Per SOR No- MORD 1200/12.11 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 20 Running of 5HP pump for dewatering including arrangement of pump suction and delivery pipes and other accessories at site including cost of POL(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
|