The Subject Of The Order Includes The Development Of The Area Around The Health Center In Cewice + Stairs. The Investment Covers The Plot With Record Numbers 72/17 (Excluding The Fenced Area - Police Parking Lot) And 72/28 Cewice Precinct. The Investment Is Included In The Health Center Building. The Subject Of The Subject Of The Contract Includes: The Scope Of The Subject Of The Contract Includes The Renewal Of The Existing Hardening Surfaces Along With The Shape Correction Using The Color Of The Pavement Pavement Depending On The Surface Function, The Construction Of Street Grooves And Sewage Wells Connected To The Existing Rainwater Drainage System. The Subject Of The Subject Of The Contract Also Includes The Construction Of Parking Spaces Along With The Marking. Demolition Materials Such As Yomb Boards Will Be Fully Transported To The Component Square Of The Cewice-Pszok Commune. The Subject Of The Contract Also Includes The Branch Of The Gravitational Sewage System From Pvc-U Sn12 Lite Pipes In Accordance With Pn-En1401-1 With A Diameter: Dn200. The Subject Of The Subject Of The Contract Also Includes: Forms The Existing Surface Of The Stairs (Entrance To The Police) And Making A New Tile Floor; Scraping, Washing The Grated Paint On The Stairs (Entrance To The Beauty Salon) And Covering Them With Epoxy Resin; Attaching Ceramic Tiles, Unevenness Of Concrete (Entrance To The Health Center) And Making A New Floor From Stone Tiles. The Object Of The Contract Also Includes Lawns - Humus 10 Cm With Sinking Grass Min. 1878 M2. The Set Scope Of Works Is Included In The Technical Design And The Bill Of Quantities. The Contractor Is Obliged To: 1. Securing The Construction Site And Conducting Construction Works, Fence Of The Construction Site. 2. Implementation Of Works In Accordance With The Project, Regulations And Applicable Pn-En And The Principles Of Technical Knowledge. 3. Use Of Products Approved For Trading And Use In Construction. 4. Ensuring Full Geodetic Service Of The Investment, In Particular The Geodetic Arrangement Of The Facility In The Field. 5. The Implementation Of The Geodetic As -Built Inventory In Accordance With Art. 57 Para. 1 Point 5 Of The Construction Law. 6. In The Event Of Damage To The Existing Underground Weapons, Cables, Cables, Channels, Etc. The Contractor Is Obliged To Repair The Damage And Incur All Costs Related To It. 7 In The Event Of Damage To Border Stones, The Contractor Will Be Required To Reproduce Them At His Own Expense. 8. Ordering The Construction Site. 9. The Contractor Is Obliged To Notify All Necessary Institutions And Network Managers Of The Start Of Construction Works For At Least 7 Days Earlier With Obtaining Relevant Statements After Completion Of Works. 10. Execution Of The As -Built And Differential Cost Estimate After The Completion Of Construction Works. The Concise Description Of The Subject Of The Contract Are Attachments: 1. Technical Design2. Bill Of Quantities3. Technical Specifications F
Contact Information
Address
Gmina Cewice,Cewice,84-312,Pomorskie,Pl636 - Słupski
Email
sekretariat@cewice.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94412077
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.