70W (Celesc Standard) Sodium Lamp, 150W Sodium Steam Lamp (Celesc Standard), 250W (Celesc Standard), 400W Sodium Vapor Standard (Celesc Standard), 70W (Celesc Standard), Sodium Steam Reactor 150W (Celesc Standard), 250W Steam Reactor (Default Celesc), 400W Sodium Reactor (Celesc Standard), Remember Photoelectronic Nf 5A Base 10Th (Celesc Standard), Nf 5A Photoelectronic Relay Base (Celesc Standard), 400W Metallic Steam Lamp (Celesc Standard), Triphasic Standard Kit (Material + Labor), Br-2-5 Mt Galvanized Fire 2 (Default) Celesc), Br -2 Arm - 3 Mt Galvanized Curved Fire (Celesc Standard), Red Wedge Connector. Iii 2, 5 6/25, Cunha Ii Vd Connector W/Cover 10-25Mm, Connector Type B Orange Type, Wedge Connector I-Cz, 16-120Mm Drilling Parallel, Full Single-Phase Standard Kit (Material + Labor), Full Standard Biphasic Standard Kit (Material + Workforce), Dt Dt Post 11/600 (Celesc) 10/300 (Celesc Standard), 20Mts Insulating Tape, 250Mm Galvanized Screw, 200Mm Galvanized Screw, 300Mm Galvanized Screw, Galvanized Square Washer, Flexible Wire 2, 5Mm, 1X50a Lighting Command, Celesc Pole Standard With Lens Reading On The Sidewalk, Three -Phase Standard On Celesc Pole With Reading Lens On Reading Lens Sidewalk, 170Mm Pole Strap, 190Mm Pole, 210Mm Pole, 230Mm Pole, 250Mm Pole, 270Mm Pole, 290Mm Pole, 300Mm Pole, Pp 2X2 Cable, E-27 Porcelain Support E-40, French Screw, French Screw 70Mm, Dt 10/300 Concrete Post, Bt Multiplex Suspension Set, 2X35mm Multiplexed Cable, Wire Rope Shoe, 500 Dan Iron Screw Look, Circuit Repair And Inspection Service To Locate Public Lighting Point (Existing Lamp Defect), Installation, Withdrawal Or Replacement Of Cunha Or Piercing (Pair), Removed Or Replacement Common Luminaire Lamp., Removal Or Replacement Of Existing Luminaire Reactor., Complete Public Lamp Replacement Service With Conventional Lamp By Led Public Luminaire Set (Comprises Conventional Lamp Lamp Removal, Reactor Arm, Relay Base, Wiring And Connections). Update Of The Withdrawal And Installation In The Celesc., Complete Set Installation Service Of Led Public Luminaire Up To 4Mts (Comprises The Installation Of Arm Up To 4Mts, Led Luminaire, Wiring And Connections). Launch And Registration In The Celesc., Full Team Service (Driver, 02 Electricians, 01 Assistant) With Vehicle Equipped To Meet Eventual Occurrence Of Emergency., Public Lighting Key Maintenance Service (Install, Remove Or Replace)., Removal Or Replacement Of Wiring From Existing Lamp Connectors. From Celesc Of New Luminaires (Unit) In The Municipality Of Ouro, Cable Connection Amendment Service., Complete Installation Or Exchange Exchange Service.
|