Execution Of Wooden Slone Warehouse Warehouse, Open Shed To Support The Production, Execution Of Toilet And Locker Room In The Workplace Of Plywood, Not Included Furniture, Execution Of Refectory In Construction Site, Water Measurement Kit- Pvc Solidable Dn, 21/03/2025, Hydrometer Dn 1/2 1, 5M3/H Installation, Three -Phase Airline Entry With Built -In Box, 10Mm2 Cable And Din 50A Circuit Breaker, Supply And Installation Of Galvanized Plate Workplate, Rubbish Removal, Metal Tile, Junior Work Engineer With Complementary Charges, Mobilization And Demobilization Of Work In Urban Center Or Boundary Region, Staffing Conventional Work, Through Potoleded Running Tablets, With Reuse., (1) Mechanized Ditch Excavation Up To 1, 5M, With Retro Excavator (Cap. Retro Bucket: 0, 26M3/Pot. 1, 30M, Ballast With Granular Material (Stone Nº 1 And 2), Applied To Floors Or Slabs On Soil, 10Cm Thickness, Manufacture, Assembly And Disassembly Of Crown Block, In Sawed Wood, (1) Block Frame Using 5Mm Assembly Steel, Block Frame Using 6, 3Mm-Assembly 8Mm Ca-50-Assembly, Block Frame Using 10Mm Ca-50 Steel-Assembly, Block Frame, Isolated Shoe, Baldrame And Shoe Running Using 12, 5Mm Ca-50 Steel, Baldrame And Shoe Running Steel 16Mm, Concrete Of Crowning Block Or Baldrame Fck 30Pa With Pump, Material With Troubles Manual Ditches, With Percussion Soil Compactor, Surface Waterproofing With Asphalt Emulsion, 2 Coats, Assembly And Disassembly Of Rectangular Pillars And Similar Structures, Simple Right Foot, Resin Plywood, Pillar Frame Or Conventional Frame Of Reinforced Concrete Structure Using Ca-50 Steel Of 10, 0Mm, Pillar Frame Or Beam. Conventional Reinforced Concrete Using 12 Ca-50 Steel Of 12, Pillar Frame Or Conventional Reinforced Concrete Structure Beam Using 16 Ca-50 Steel, Pillar Frame Or Conventional Beam Of Reinforced Concrete Using Ca-60 Steel Of 5, Pillars Concreting With Pump-Release, Thickening And Finishing, Assembly And Dismantling Of Beam, Metal Shuttle Of Resin Wood, Pillar Frame Or Conventional Reinforced Concrete Structure Beam Using 6, 3Mm- Assembly, Pillar Frame Or Conventional Frame Of Reinforced Concrete Structure Using Ca-50 Steel Of 8, (1) Pillar Or Conventional Concrete Structure Armed Structure Using Ca-50 Steel Of 10, (1) Pillar Frame Or Conventional Concrete Structure. Using 12 Ca-50 Steel Of 12, (1) Pillar Frame Or Conventional Reinforced Concrete Structure Use Using 16 Ca-50 Steel, (1) Pillar Frame Or Conventional Reinforced Concrete Structure Use Using Ca-60 Steel Of 5, Concreting Of Beams And Slabs, Fck = 30Mpa, For Solid Or Ribbed Slabs With Pump, Assembly And Disassembly Of Slab Massive, Double Right Foot In Ch
|