The Contracting Authority Requires The Contractors To Make A Local Vision Before Submitting The Offer-The Terms Of The Deadlines Should Be Made To E-Mail Forkargi@Aqua-Zdroj.Pl1. The Subject Of The Order Includes Delivery With The Installation Of The Door To 9 (Nine) Rooms And Up To 2 (Two) Technical Rooms At The Aqua-Zdrój Hotel At Ul. Ratuszowa 6 In Wałbrzychui. As Part Of The Subject Of The Contract, The Contractor: 1) Will Dismantle The Current Doors With The Frames And Make Their Utilization, Which Will Confirm With The Relevant Document, 2) Will Provide And Replace The Entrance Door To The Contracting Authority To The 9 (Nine) Rooms And 2 (Two) Technical Rooms Indicated By The Contracting Authority On The Third Floor Of The Aqua-Zdrój Hotel Together With The Frames; 3) Equip The Door With A Branch Hotel Corridor And Handle From The Hotel Room, As Well As In A Key Insert That Allows The Hotel Door To Be Opened For Emergency; The Indicated Elements Will Be Silver Matte Or Similar, A Minimum Endurance Class 4, 4) Will Equip The Door With A Self-Closed, Strength, Silver, Force 2-5, Cardiac Cam (Reduction Of The Force Needed To Open In The Range Of 0-30 Degrees). Ii. Other Requirements Regarding 9 (Nine) Hotel Doors: 1) Doors Type - Line Doors, Including 2 Right Doors And 7 Left Doors, All Opening To The Center Of The Room, 2) Metal Frame, Adjustable, With A Minimum Sheet Of 1.5 Mm Powder Painted, Strengthened, Reinforced With A Self -Clipped, Dawn, Color - Dark Gray 3) Currently Installed, The Line Doors Have The Following Dimensions Of 90 X 220 Cm, 4) The Contractor Will Dismantle The Old And Assembly Of A New Solenoid Bond To Open The Door By Hotel Guests Using A Dedicated Card In 9 Hotel Rooms Where The Doors Will Be Replaced. Standard Operating Solepat At The Main Castle - Certified. Solenoid Tap Adapted To The Existing Hotel Guests Service System (I.E. Lsi Positive) In Rooms: H4.05; H4.06; H4.07; H4.08; H4.20; H4.21; H4.22; H4.23 H4.24 (9 Hotel Rooms), Eccuce Tire Un = 12V. The Solepatrosis Should Have A Function Enabling In The Future To Control The Presence Of A Guest In The Room, 5) The Door Leaf Must Be Full, Flat, Covered With A Cpl Veneer With A Minimum Thickness Of 0.7 Mm, 6) The Wing Thickness Must Be A Minimum Of 50 Mm, 7) The Wing Cover Will Be Hdf Or Chipboard, Colors. Wood), 8) Doors Should Be Filled With A Sound Insulation And Fireproof Insert, 9) Doors Must Have A Minimum Fire Resistance Of The Ei30, Confirmed By Appropriate Approvals And Certificates, 10) Doors Should Be Equipped With A Self -Inspection Threshold Gasket, 11) Acoustic Isolation Of The Door Must Be A Minimum Of Rw = 37 Db And Must Be Confirmed By Appropriate Certificates/Approvals, 12) Doors Must Be Smokeproof13) Strength Requirement For Doors - Minimum 4Th Grade Of Mechanical Strength Or Higher, 14) Appropriate Certificates Must Be Issued For The Door (In The Collared Operation) And Approvals, 15) The Contracting Authority Fails To Allow Ventilation In The En
|