Quotation Are Invited For Steam Turbine Rotor Stand Fabrication Service. The Scope Of Work For The Fabrication Of A Steam Turbine Rotor (Qty: 02Nos) Stand Typically Involves The Following Key Steps And Act Ivities:Sample Availability: A Sample Is Available At The Site For Viewing Ifrequired.1. Design And Engineeringreview Specifications : Understanding Client Requirements, Standards, Andturbine Rotor Specifications And Attached Drawing.Detailed Design: Detailed Drawi Ngs And Models For The Rotor Stand,Considering Load, Material, And Manufacturing Requirements.Stress Analysis: Conducting Structural Analysis To Ensure The Stand Canhandle The Weight And Stresses Of The Turbine Rotor During Installation,Operation, And Maintenance. 2. Material Procurementmaterial Selection: Identifying And Procuring The Necessary Materialsfor Fabrication.Quality Control: Ensurin G That The Materials Meet Required Standards Andspecifications.3. Fabrication Processcutting And Shaping: Cutting The Material Into Appropriate Sizes Andshapes For The Stand Components (E.G., Base, Supports, Brackets).Welding: Performing Welding Operations To Join The Parts, Ensuringstrong And Reliable Connections.Machining: Precision Machining Of Parts To Meet Dimensional Accuracy Andensure F Itment With The Steam Turbine Rotor.Assembly: Assembling The Fabricated Components Into The Final Rotorstand Structure As Per Drawin G Attached.4. Inspection And Testingdimensional Checks: Verifying The Dimensions Of The Components And Thecomplete Stand Against Des Ign Drawings.Weld Inspection: Performing Non-Destructive Testing (Ndt) To Inspectwelds For Defects.Load Testing: Conducting Static L Oad Testing Or Simulating Conditions Toensure The Rotor Stand Can Handle The Expected Loads Safely, Each Standmust Be Tested At 60 T Ons, And A Load Test Certificate From Anauthorized Party Is Mandatory.5. Surface Treatmentcleaning: Removing Any Dirt, Grease, Or Co Ntaminants From The Standsurface.Surface Coating: Applying Protective Coatings (E.G., Paint,Galvanization) To Protect Against Corros Ion And Ensure Longevity.6. Packaging And Deliveryprotection: Ensuring Proper Packaging For Safe Transport, Includingprotective Meas Ures To Prevent Damage During Handling.Documentation: Providing All Required Documents (E.G., Inspectioncertificates, Material Certificates, And Test Reports).7. Quality Assurancefinal Inspection And Approval: Conducting A Final Inspection With Clientto Ensure The Stand Is Ready For Use. Qty: 2 Steam Turbine Rotor Stand Fabrication Service Jobm Station Cest-10,20 And 30 Spare Rotor .Rotor Stand Drawing Attached For Sample View Please Email: Hassan.Elenin@Dewa.Gov.Ae/ Hossam.Mostafa@Dewa.Gov.Ae / Iftekarkhan.Pathan@Dewa.Gov.Ae Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Srm.Dewa.Gov.Ae/Sap/Opu/Odata/Sap/Zsrm_Rfx_Reg_Bid_Srv/Attachmentset(2332500783)/$Value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94373261
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.