Part No. 1 Mon.: Construction Of Office And Social Buildings 1. The Subject Of The Contract Is The Construction Of Office And Social Buildings Together With An External Water Supply Installation, External Sanitary Sewage Installation, External Power Installation, On Plot No. 412/3 In Bysław, The Lubiewo Commune, Tuchola Poviat. 2. The Scope Of Works In Particular: 1) Office And Social Buildings With Installations: Building B The B Building, Office And Social Buildings-Low, Single-Storey Facilities, Without A Basement, Without A Basement. Layered With A Galvanized Steel Sheet 0.5 Mm Powder Painted. Exterior Walls Insulated With Mineral Wool With A Thickness Ensuring That The Requirements Of Wt 2021 (E.G. Mineral Wool Gr. 200 Mm). Floor Floor With A Layered Structure With Galvanized Steel Sheet. 0.5 Mm Powder Painted. A Floor Insulated With Mineral Wool With A Thickness Ensuring That The Requirements Of Wt 2021 (E.G. Mineral Wool Is 180 Mm). Light Partition Walls In The Gypsum-Cardboard Building. In The A Building, Rooms Such As: Sanitary Lock, Office-Yellow, Dirty Cloakroom, Toilet, Pure Cloakroom And Communication In The Form Of Corridors Were Separated. On The Roof Of The Building, The Installation Of A 6 Kw Photovoltaic Installation: 16 Pv 375W Modules Is Designed. Kotten Directly To The Roof Structure, This Should Be Consulted With The Container Manufacturer. The Valley Is To Be Installed Outside The Building On The Facade. Dc Surgery On The Ac Side. The Maximum Possible Current Will Be 10.95A Adopted A 12A Fuse (Selecting The Selected Inverter). Making The Necessary Notification Of The Connection Of The Solar Installation In The Local Energy Plant. The Contractor Is Obliged To Configure The Inverter, I.E. Connection With The Internet In Order To Monitor Remotely Energy Production, Ecological Benefits And Control Of The Photovoltaic Installation. The B Building Is An Office. Construction Of Skeletal Buildings - The Possibility Of Buying Ready -Made Container Facilities In Accordance With The Parameters Contained In The Project Or Construction Of Facilities In Accordance With The Project. Note! 1. The Architectural Design Constituting Annex 8 To Swz And The Technical Design Constituting Annex 9.1 To Swz Predict The Construction Of A Roofing Above The Sedimentary Plot (Shelter) And Retaining Walls. The Subject Of The Contract Does Not Include The Implementation Of These Elements. 2. Source Of Heating Buildings - Electrical Installation - Air Conditioners With Heating Function And Electric Heaters, Source Of Hot Water - Electric Water Heater. 3. Determination Of The Subject Of The Order According To The Joint Order Dictionary (Cpv): 45000000 - 7 Construction Works 45111300 - 1 Demolition Works 45111200 - 0 Works In The Preparation Of The Area For The Construction And Earthworks 45200000 - 9 Construction Works In The Field Of Erecting Complete Building Objects Or Their Parts And Works In The Field Of Land And Water Engineering 452100 - 2 Construct
Contact Information
Address
Gmina Lubiewo,Lubiewo,89-526,Kujawsko-Pomorskie,Pl618 - Świecki
Contact No.
523349310
Email
ug.glazik@lubiewo.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94371754
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.