1. The Subject Of The Contract Is To Remove The Effects Of Floods By Modernizing Primary School No. 1 In Lądek-Zdrój In The Scope Of Horizontal Insulation Of Foundation Walls. 2 Plastering, From 16 To 31 % (Measurements Of The Beginning Of December 2024), The Humidity Of The Existing Concrete Floors (After Removing The Tiles) From 15 % To 23 % (Measurements Of The Beginning Of December 2024), As A Result Of Flooding Of The Rooms, The Floors Were Damaged From Tiles, Internal Plasters On The Walls And Ceilings, Electrical Installation, Carpentry, Interior And External Door Joinery Window With Pvc, 3. The Scope Of The Order Provides For The Following Construction Works: Internal Construction Works Temporary Lighting Of Rooms With Halogen, Inventory Of All Walls In The Basement, To Check Whether In Individual Walls Of Foundation Walls, There Are No Elements Of Sanitary And Electrical Installations, Technical Openings Under The Diamond Rope, Every 1.00 M, Wall Thickness. The Wall Thickness Is Shown At The Basement Of The Basement - Annex No. 1 To Opz, Protection And Wrapping Of The Walls Against Dirt, Horizontal Insulation By Cutting The Foundation Walls In The Level Of The Diamond Rope (Material - Brick, Stone, Slate, Concrete, Reinforced Concrete). The Cutting Level Was Pre -Designed 30 - 40 Cm Below The Window Sills, Ultimately As Possible As Possible. The Choice Of Technology To Make Horizontal Insulation Of Foundation Walls, By Cutting With A Diamond Rope, Results From Various Materials From Which Foundation Walls Were Made - Brick, Broken Stone, Pebbles, Slate. Masonry Walls Do Not Have A Horizontal Weld To Use Another Technology, Cut A Cut With A Diamond Rope, Because Such A Solution Prevents Damage To Concrete, Masonry Or Stone Structures, Obtaining A Smooth Cutting Surface. The Rope Is Cut Without Vibration, Stroke And Dust. For Cutting, A Steel Rope Is Used With Mounted Synthetic Diamond Elements, Which Will Fade The Cut Cross -Section. The Cut Is Made Wet, A Tense Rope Using A Rope Saw System, Moves In One Direction And Crosses The Given Element. Cutting Is Made In Water Cover And Under The Supervision Of Experienced People, Horizontal Insulation Made Of Insulation Material, Made Of Plastic Plastic. Horizontal Insulation Boards From Polyethylene Or Polyester Film With Glass Fiber, Plates Overlap With A Min 10 Cm, Protrude From The Walls To The Thickness Of The Plaster, Walking Of Technological Holes, Cleaning Works - Collecting Water And Spoil After Drilling And Cutting The Rope, External Construction Works For Input Barriers To The Entrance Barriers To The Entrance Staff Barrier Piwnica, Disrguing The Roofing Of The Basement On The Facade, Material From Dismantling To Transfer To The Contracting Authority, Dismantling The Concrete Stairs To The Basement, Along With Retaining Walls. Removal And Utilization Of Materials From Demolition, Disintegnration Of Paved Surfaces From Granite Cubes, With Folding, Execution
|