1. The Subject Of The Contract Is The Construction Of Road Lighting And Pedestrian Crossings In The Brzeg Dolny Commune. The Location Of The Location Is Included In Annex 1: 1) 24 Locations In The Commune Of Brzeg Dolny - Pt Road Lighting; 2) 10 Locations - Pt Lighting Pedestrian Crossings (Comprehensive Design Of Taken Pedestrian Crossings). The Work -Worn Documentation Will Include: 1) Construction And Executive Project Along With Decisions, Arrangements, Permits And Options For The Relevant Authorities Necessary To Obtain Permission/Notified. Construction, 2) Designed Infrastructure In Electronic Version In Format As Files Of The Database Supported In The Gis Program, 3) Cost Part: Investor Cost Estimate Together With A Collective List Of Costs And A Bill Of Quantities, 4) Technical Specification Of The Implementation And Receipt Of Construction Works, 5) Documents - Decisions Required By Construction Law Entitling To Carry Out Works Documentation.6) Approved Traffic Organization, Including Temporary And Target (For Pedestrian Crossings) 7) Pt Pedestrian Crossings Are To Include Industry Parts: Road (Raised Pedestrian Crossing), Lighting, Organization Of Time And Target Traffic. 2. Design Documentation Should Be Developed In Accordance With Applicable Regulations And Technical Knowledge, Including Of: 1) By The Act Of 7 July 1994 Construction Law (Journal Of Laws 20124.725 I.E. Of 2024.05.14) 2) By The Regulation Of The Minister Of Development Of 11 September 2020 On The Detailed Scope And Form Of The Construction Project (Journal Of Laws 2020 Item 16609) .3) Regulation Of The Minister Of Infrastructure Of 2 September 2004 And Forms Of Project Documentation, Technical Specifications For The Implementation And Acceptance Of Construction Works As Well As A Functional And Utility Program (Journal Of Laws 20121.2454 Of 2021.12.29) .4) By The Regulation Of The Minister Of Infrastructure Of May 18, 2004 On Determining The Methods And Grounds For Preparing An Investor Cost Estimate, The Calculation Of Planned Costs Of Project Work And Planned Costs Of Construction Works Specified In Construction Works Specified In Functional And Utility Program (Journal Of Laws 20121.2458 Of 2021.12.29) .5) By The Act Of 20 July 2017 Water Law (Vol. Journal Of Laws 2017.1087 I.E. Of 2024.07.22). 3. As Part Of The Contract In Question, The Contractor Undertakes: 1) Provide The Documentation Made To The Contracting Authority In A Paper Version And An Additional 1 Ezg. On A Cd Or Dvd Medium In Open Files Forms: Drawings Saved In Files *.Pdf And *.Dxf; Technical Description, Information On Healthcare Safety And Health Care, Water -Legal Report, Technical Specification And Acceptance Of Construction Works Will Be Saved In A Commonly Used Text Editor In The *.Dt And *.Pdf Format, Other Documents Such As: Arrangements, Opinions, Decisions, Etc. Are To Be Scanned And Attached To The Documentation Submitted On The Cd Or Dvdw Format *.Pdf *.Jpg.2) Provide The Cost Of Documenta
Contact Information
Address
Gmina Brzeg Dolny,Brzeg Dolny,56-120,Dolnośląskie,Pl518 - Wrocławski
Email
um@brzegdolny.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94371718
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.