Construction Work - Federal Environment Agency - Dahlemer Dreieck Haus 1 - Dach And Plumbing Work - Award 530/2025. Ve_36310_Dachdecker And Plumbing Work According To Atv Din 18338 Roofer And Atv Din 18339 Roof Plumbing Work General Information: Connected Sub-Areas: 1. New Construction Laboratory Building In Reinforced Concrete Construction With A Wooden Sandwich Facade And In Front Architecture Concrete Elements. Cubature Continues To Differentiate By Reduced Roof Terraces And A Two -Storey Technology Structure With A Flat Roof. 2. Comprehensive Renovation Of The Existing Building (Old Building) Of The Turn Of The Last Century, With The Beiberg -Covered Gable Roof, Side Risalites And A Copper -Covered Tower Structure. Services New Construction (Ec, Roof Terraces, Flat Roof, Technology Floor):- Sealing Ground-Touched Walls And Ceilings According To Din 1853-1/2 500 M²- Sealing Wu Consoles Liquid Plastic Support For Arch Concrete 160 M²- Roof Seal. Diffusiond.Leschicht Bitumenbahn Ksp -Val On Osb 900 M² - Geflectional Insulation Layer Ps -Hard Foam Eps 0.035W/(Mk), I.M 80Mm 600 M² - Thermal Laminated Layer Flat Roof Foam Glass 0.038W/(Mk) D 80Mm 150 M² - Attic Coating. Alu D 2Mm Cutting -B 900-1000Mm 5X Credited 250 M² - Flat Roof Exit Heated Steel Niro L 2.4 M Incl. Stairs 1 Stck - Deflector Hood, Round, Steel 30 Mm 4 Pc - Ventilation And Smokehouse Hood, Galvanized, L 0.62 M B 0.80 M 4 Pc - Equipment Photovoltaic Modules Including Inverter And Support Structure 52 Pcs On A Flat Roof Technology Floor (Transfer Point To Elt Are The One To Be Assembled) Performance (Inventory Roof 1,200 M2 - Ibies Using As Many Existing Materials, Any Necessary Renovation Services Of The Tower Structure Are Currently Not Included. The Tower Structure - Demolition Inventory Flat Roof Structure (Bituminous /Pollutant) 100 M² - Disassembly Bibertation 100 M² - Dismantling + Side Storage Of Bricks For Later Reinstalling 700 M² - Dismantling Of Existing Channels And Fall Pipes 200 Lfm - Dismantling 220 Lfm - Undervoltage Fitted Roofs 680 M² - Checking And Repairing (In Sections) 680 M² - Base Loading/Loading New 890 M² - Stocky/Supplementary Beer (In Partial Sections) 890 M² - Roof Exit Made Of Coated Steel, Nominal Size 500/650 Mm 2 Pccoat - Assembly Weather Protection Grille B/H Approx. 1800/1600 Mm 2 Pc - Wall Cover. Risalite/ Titanium Zinc D 0.7Mm Cutting -B 500Mm 4X Caught 50 Lfm - Eaves Strip Titanzbar D 0.7Mm Cutting -B 400 To 500 Mm 4X Creached 300 Lfm Connection D 0.7Mm Cutting B 250 Mm 6X -Hedged 170 Lfm - Refurbishment Construction Time Copper Roof (Welschsche Haub) - Corganization Layer Flat Roof Ps -Hard Foam Eps 100 M² - Thermal Insulation Layer Flat Roofs Ps -Hard Foam Xps D 140Mm 100 M² - Establishment 125 Photovoltaic Modules Including Interchangeable Courses
Contact Information
Contact No.
+49 30-184010
Email
jeannette.gnauck@bbr.bund.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94353292
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.