1. The Subject Of The Order Is The Purchase, Delivery, Assembly And Configuration Of The Following Equipment:- Server With Installation And Configuration,- Utm Devices (New Generation Firewall),- Ups Emergency Power Supply,- Hdd.2 Hard Drives. Minimum Technical Requirements: 1) Server:- Housing: Tower,- Motherboard: Service For 2 Processors,- Processor: Intel Xeon Silver 4310 (12-Core, 2.1 Ghz),- Ram: Min. 80 Gb Ddr4 Rdimm 3200 Mt/S, Expanding Up To 1 Tb,- Disks: 1X Ssd 480 Gb + 2X Hdd 2Tb 7.2K Rpm Sata 512N,- Raid Controller: Perc H755,- Power Supplies: Redundantne 2X 700 W,- Network Interfaces: 2 X 10/100/1000 Mbit/S,- Card Management: Idrc9 Enterprise,- Operating System: Windows Server Essentials 2022 (Year License) Or Equivalent,- Certificates: Iso 9001: 2015, Iso 14001, Declaration Of Eu Compliance,- Required Documentation In Polish. 2) Utm (Firewall Ngfw): Gbps, Antivirus 300 Mbps,- Max. Number Of Ipec Vpn Tunnels: 50, Sessions: 150,000,- Functions: Ips, Ssl Vpn, Ipsec Vpn, Built-In Anti-Virus,- Installation: Rack Wardrobe, Cabinet, On The Wall Or Din Rail,- Power Supply: Ac 100-240V, Dc 12-48V -20 ° C Up To 60 ° C,- Certificates: Declaration Of Eu, Fcc, Rcm, Ukca, Iec 61000-4-12,- The Contractor Will Ensure Training Of The Ordering Personnel. 3) Ups:- Power: 3000 Va / 3000 W,- Architecture: On-Line,- Voltage Shape: Full Sinusoid,- Battery: 6X 12 V, Casing: Rack,- Ports: Iec-C14, Schuko, Usb 2.0, Rs-232, Epo,- Operating Temperature: 0 ° C ~ +40 ° C,- Certificates: Compliance With Eu, Rohs, Iso,- In Set: Cables, Assembly Accessories, Instructions. 4) Hdd Drives:- Type: Hdd, Hdd, Format 3.5 (Lff),- Capacity: 4 Tb,- Interface: Sata Iii (6 Gb/S),- Rotational Speed: 5400 Rpm,- Buffer: 256 Mb,- Certificates: Eu, Rohs, Iso.3. The Contractor Undertakes To:- Assembly And Configuration Of The Server In The Rack Wardrobe, Raid Installation, Operating System And Integration With The Lan/Vpn/Vlan Network,- Installations And Utm Configuration, And Training Of The Contracting Authority Personnel,- Assembly And Launch Of Ups,- Transfer Of Full Technical Documentation In Polish. 4. The Supplied Hardware And Software Must Meet The Required Technical And Certification Standards (Iso-9001, Iso-14001, Fcc, Rcm, Ukca, Iec 61000-4-12, Rohs, Iso) And Also Ensure Compliance With The Existing Infrastructure Of The Ordering Party. 5 The Supplied Devices Must Have An Eu Declaration Of Compliance, Entitling To The Importance Of The Product With A Security Sign, And Must Be Marked With This Sign. 6. The Contractor Undertakes To Ensure A Guarantee For The Completed Components, Including: A) ...... Years Warranty On The Server, Including All Components, Including Processors, Ram, Raid Controllers And Power Supplies, B) Other Equipment In Accordance With The Conditions Of The Manufacturers Warranty, C) Response Time To Reporting The Failure: Next Business Day (Nbd), D) Replacement Of Damaged Components Within 2 Days Within 2 Days Working, E) In The Event Of A Hard Disk Fai
|