Quotation are invited for Cutting of Super Duplex Piping in Palm Jumeirah RO Plant 1032500929 1 ITEM-00001 CONTRACTOR SCOPE OF WORK:- CUTTING OF SUPER DUPLEX PIPES AS PER ENGINEERS REQUIREMENTS.- WORK SHALL BE CARRIED OUT UNDER THE SUPERV ISION OF DEWA.- THE CONTRACTOR IS RESPONSIBLE FOR ARRANGING ALL REQUIRED MANPOWER TOCOMPLETE THE JOB.- A QUALIFIED WELDER IF REQUIRE D. THE CONTRACTOR SHALL SUPPLY ALLNECESSARY WELDING EQUIPMENT, INCLUDING WELDING MACHINE, ELECTRODES,WELDING HELMET, WELDING GLOVES, HAMMERS AND OTHER SUPPORTING TOOLS.- THE CONTRACTOR SHALL PROVIDE ALL NECESSARY POWER TOOLS AND HAND TOOLS,INCLUDING BUT NOT LIMITE D TO: GRINDERS, CUTTING TOOLS ETC.- THE CONTRACTOR SHALL ENSURE THAT ALL WORK IS CARRIED OUT IN COMPLIANCEWITH DEWA SAFETY REGULATIO NS AND SITE REQUIREMENTS.- PROPER PPE (PERSONAL PROTECTIVE EQUIPMENT) MUST BE WORN BY ALLPERSONNEL INVOLVED.- TOOL BOX 1 AU TALK, RISK AS SESSMENT AND DYNAMIC RISK ASSESSMENT. AFTER COMPLETION, THE CONTRACTOR MUST CLEAN THE AREA AND REMOVE ANYWASTE MATERIALS.DEWA SCOPE :- NECESSARY HOT WORK PERMIT BEFORE ANY WELDING, GRINDING, OR CUTTINGACTIVITIES CAN BEGIN.- GATE PASSES, ENTRY PERMITS, AND ANY NECE SSARY WORK AUTHORIZATION FORTHE CONTRACTOR PERSONNEL, TOOLS, AND EQUIPMENT. 2 ITEM-00001 CONTRACTOR SCOPE OF WORK:- A QUALIFIED RIGGER SHALL BE RESPONSIBLE FOR USING A CRANE TO SAFELYLOAD THE CUT SUPER DUPLEX PIPE SEGMENT S ONTO THE TRANSPORT TRUCK.- PROPER LIFTING TECHNIQUES, SLINGS, AND RIGGING EQUIPMENT SHALL BE USEDTO PREVENT ACCIDENTS.- THE CONTRA CTOR SHALL PROVIDE A SUITABLE VEHICLE (TRUCK) FORTRANSPORTING THE PIPE SEGMENTS FROM PALM JUMEIRAH RO PLANT TO JEBEL 1 AU ALIPOWER STATIO N SCRAP YARD.- THE CONTRACTOR SHALL ARRANGE ALL NECESSARY PERSONNEL REQUIRED FORLOADING, SECURING, AND UNLOADING THE PIPES.- THE CON TRACTOR SHALL ENSURE THE PIPE SEGMENTS ARE PROPERLY SECURED ONTHE TRUCK USING APPROPRIATE RESTRAINTS, SUCH AS STRAPS, CHAINS, ORBLOC KING, TO PREVENT MOVEMENT DURING TRANSPORT.- THE CONTRACTOR SHALL COMPLY WITH ALL ROAD TRANSPORT AND SAFETYREGULATIONS DURING TRANSI T.- UNLOADING AT JEBEL ALI POWER STATION SCRAP YARD.DEWA SCOPE:- FACILITATE ACCESS TO BOTH PLANTS FOR THE TRANSPORTATION PROCESS SPECIAL NOTES / INSTRUCTIONS: Cutting of super duplex piping in Palm Jumeirah RO Plant Vendors are invited for site visit for technical evaluation For more info: Mohammad.ali1@dewa.gov.ae STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332500752)/$value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94314513
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.