Tender Available Date: Thursday, March 20, 2025.Tender Closing Date: Wednesday, April 16, 2025.Pre-Tender Meeting: Monday, March 31, 2025 Commencing At 1:30:00 P.M. Mst Virtually Over Ms Teams. Attendees Will Need To Join The Meeting Through The Following Link:Click Here To Join The Meeting Project Inquiries: Ikhtiyar Mammadov, Project Procurement Officer, Alberta Transportation And Economic Corridors. E-Mail: Ikhtiyar.Mammadov@Gov.Ab.Ca.Tenders Will Only Be Received By Email At Trans.Tender@Gov.Ab.Ca, Before 2:01:00 P.M., For Construction Of The Following Work:Tnd0022515asphalt Concrete Pavement (Acp), Grading, Granular Base Course (Gbc), Street Light Installation, Cold Milling, Construction Of Storm Water Management Facilities, Drainage Improvements, Grade Improvement, Heavy Rock Riprap Installation, Minor Grading, Pavement Markings, Seeding, Traffic Signal Installation, Subgrade Preparation, Wildlife Fence Installation, Grouting And Abandonment Of Existing Culvert And Other Workhwy 08:06Highway 8 Improvements - West Calgary Ring Roadto Lott Creek Boulevardkilometre 13.390 To 16.842Hwy 08:06Overhead Sign Structure Installation And Modification - Bf 82475Ze1, Bf 82475Ze2 And Bf 82475Ze3hwy 201:06Overhead Sign Installation - Bf 77546Zw1demolition Of Existing Bridge Structurehwy 08:06Bf 02143E-1 - Carrying Highway 8 Over Elbow River, 19 Km W Of Calgaryconstruction Of Precast Prestressed Concrete Girder Bridge And Bridge Paintinghwy 08:06Bf 02143E-4 - Carrying Highway 8 Over Elbow River, 19 Km W Of Calgarymajor Capital Projectsapproximate Quantities:1Lump Sumtraffic Accommodation96,400Tonnesupply Of Aggregate - With Option211,600Cubic Metrecommon Excavation8,300Cubic Metrecommon And/Or Borrow Excavation Loaded To Trucks15,200Square Metreremove And Dispose Existing Asphalt Concrete Pavement460square Metrereinforced Soil Slope - Supply And Install114metreculverts - Supply And Install (800 Mm Dia. C.S.P.)527Square Metrehand-Laid Riprap - Other Locations - Supply And Place9,500Cubic Metrepond Clay Liner25,000Square Metreseparation/Filtration Geotextile - Supply And Install (Class A)2,350Tonnegranular Fill - Liner Protection (Des 6, Class 125)231,200Square Metretopsoil Placement23eachwildlife Escape Ramp - Supply And Install10.2Kilometrenew Fence - Supply And Install - Wildlife Exclusion Fence63,250Tonnegranular Base Course Des. 2 Class 2520,500Tonneasphalt Concrete Pavement - Superpave - Mix Type 20-F-12.5 (Pg 64-34)10,300Tonneasphalt Concrete Pavement - Superpave - Mix Type 20-F-20 (Pg 58-34)1,170Metremodified Thrie Beam Guardrail - Supply And Install4,470Metretrenching And Backfilling520metreunderground Electrical Conduit - Supply And Install - Trench Excavation (1 X 53Mm Conduit)4,160Metresecondary Cable - Supply And Install (4C#8 Teck Cable)43Unitpre-Cast Concrete Street Light Base - Supply And Install43unitstreet Light Standard - Supply And Install (15M X 2.5M Single Davit & Luminaire)1Lump Sumtraffic Signal System - Supply And Install (Hwy 8 & Lott Creek Blvd)1Lump Sumoverhead Sign Structure - Foundation Supply & Installation And Structure Installation (B.F. 82475Ze1)1Lump Sumoverhead Sign Structure - Foundation Supply & Installation And Structure Installation (B.F. 82475Ze2)1Lump Sumoverhead Sign Structure - Foundation Supply & Installation And Structure Installation (B.F. 77546Zw1)1Lump Sumtemporary Access Berms, Cofferdams And Dikes1lump Sumdemolition And Disposal Of Bridge Structure1lump Sumexcavation - Structural1lump Sumbackfill1,165Cubic Metreheavy Rock Riprap (Class 2)570Metresupply Of Piling - Plain Steel H-Pile34pilepile Set-Up (Driven Piles)120Metrepile Installation (Drilled Piles)266Cubic Metreconcrete (Class Tremie) - Supply And Place96,514Kilogramplain Reinforcing Steel - Supply96,191Kilogramstainless Reinforcing Steel - Supply192,705Kilogramreinforcing Steel - Place518cubic Metreconcrete (Class Hpc) - Supply And Place1lump Sumprecast Concrete Units - Supply And Fabrication, Delivery And Erection - End Span Girders1lump Sumprecast Concrete Units - Supply And Fabrication, Delivery And Erection - Main Span Girders1,287Square Metrewaterproofingcontractor To Supply All Materials.Contract Completion Date: October 31, 2026.
|