Facade Work- Room And Wooden Facade Work. ## Extension New Building Geschwister-Scholl Comprehensive School #Kurt-Huber-Weg 1-5/37079 Göttingen ## The Property Is Located On The Northwestern Edge Of The City Center Of Göttingen, Well-Connected Via A Main Road And The Federal Road 3. The School Premises Are Parallel To The Water. The Construction Site Is Located In The Back Of The School Area. The Building Location Itself Is Opened Up From Grätelstraße Via An Approx. 3 M Wide, Existing Path That Is Built And Used As A Construction Road. The Kurt-Huber-Weg Itself, Which Is The Addressed Street Of The School Area, Runs As A Fortified Road Across The Entire School Premises, But Must Not Be Used As A Construction Road And Access To The Construction Site. A Place Tour Is Recommended. A Photo Documentation Of The Property Is Included In The Tender Documents. Parking Is Prohibited On The School Premises And Is Generally Only Possible In Public Space. Parking On The Property / On The Construction Site Is Also Very Limited; It Is Possible To Enter And End; However, Deliveries Must Be Registered With The Construction Management 3 Days In Advance. Areas For The Construction Site Equipment And Storage Options Must Also Be Coordinated With The Local Construction Monitoring / Ag And Can Be Secured Independently. ## The New Building Comprises Two Above -Ground Full Floors With A Partial Basement, Which Is Completely In The Ground. #Usage Area: 2,184.8 M² (Without A Basement), 2,247.5 M² (With Basement) #Net Area Area: 2,893.5 M² (Without Basement) 3,674.5 M² (With Basement Floor) #Gross Floor Space: 4,137.59 M² #Gross Space Content: 16,996.1 M³ #The School Building Is In Wooden Panel Construction Built, The Basement Is Planned In Reinforced Concrete Construction (Wu Concrete). The Reinforced Concrete Cores In The Center Zone And The Stairwells Are Carried Out As Further Stiffening Of The Building. A Wooden Facade Consisting Of Prefabricated Elements Is Provided As A Facade, And A Post-Bar Facade Is Planned In The Area Of The Input Situation. The Mixing Construction Of The New Building Is Reflected In The Interior Of The Building In The Form Of Visible Bsp Ceilings And Walls And Exposed Concrete Surfaces. #Ter New Building Is Planned In The Passive House Standard, With A Pv System And Night Cooling. ## Essential Execution Work Are: #Trag Construction Made Of Bretting Wood And Glowing Wood Elements (Ceiling, Walls, Supports, Beams) And Prefabricated External Change Elements Including Windows, External Gear, External Cladding Etc. Prefabricated External Change Elements: #30 Pc. Eg (Div. Sizes) # Stk. Attica (Various Sizes) #35 Pieces. Refrigerant #84 M Base Sheet #6 Pieces #55 M² Facade Slabs Canopy #66 M² Facade Panels Canopy Ceiling #1860 M² Board Perrot Wand Inside D = 14 Cm #48 Pieces #6 Pieces #91 Pc. #6 Pcs. Wooden Supports On The Outside #37 Pcs. Wooden Supports Inside (Various Sizes) #230 M Global Wood Undergrounds 20/60
Contact Information
Address
Hiroshimaplatz 1-4
Contact No.
+49 551400-2310
Email
vergabestelle@goettingen.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94288086
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.