Mobilization And Demobilization Of Work In Urban Center Or Bordering Region With Value Up To 1,000,000, 00, General In Charge With Complementary Charges, Supply And Placement Of Work Plate In Galvanized Plate #26, Esp. 0, 45 Mm, Plotted With Vinyl Adhesive, Posted With Rivets 4, 8X40 Mm, In Metalon 20X20 Mm Metalon Structure, Esp. 1, 25 Mm, Including Autoclaved Eucalyptus Support Painted With Pva Ink Two (2) Coats, Mechanized Demolition Of Reinforced Concrete, With Pneumatic Equipment, Including Removal And Stacking, Exclusive Transport And Removal Of Demolished Material, Transportation Of Any Nature In Truck, Distance Greater Than 10Km And Less Than Or Equal To 20Km, Within The Urban Perimeter, Exclusive Load, 20/03/2025, Mechanized Aplilization On Valament Background With Vibrating Plate, Exclusive Excavation, Supply Of Structural Concrete, Prepared On Work With Concrete, With Fck 25Mpa, Including Launch, Densification And Finishing (Foundation), Podotatile Concrete, Directional Floor (20X20cm) With Dried Joint, Red/Yellow, Industrialized Mortar, Including Supply And Installation, Concrete Medium And Installation. Pre-Molded Fck & Gt; = 20Mp, Sudecap Standard Type A, 30 X 14, 2/12 (H X L1/L2), 80 Cm Length, Pedestrian Or Zebra Range With Epoxy Paint, E = 30 Cm, Manual Application. Af_05/2021, Shtrp Reflective Tacha, With Choskery At Both Sides (Execution, Including Supply, Placement And Transportation Of All Materials), Smerald Grass Planting In Plates, Including Vegetable Land And Conservation For Thirty (30) Days, Fertilizer Application To Soil. Af_05/2018, Application Of Limestone For Solo Ph Correction. Af_05/2018, Manual Ditch With Depth Greater Than 1, 5M And Less Or Equal To 3, 0M, Including Side Discharge, Corten Steel Decoration, Supply And Installation Of Totem In Acm - According To Landscape Project.
|