The Subject Of The Order Is The Modernization Of Vacancies In The Housing Resource Of The Department Of Housing Economy. Task No. 1: A Residential Premises At Ul. Bogusławskiego 1B/8 Towning Of The Subject Of The Contract: 1. General Construction Works: 1) Demolition And Disassembly Works: A) Disassembly Of Plastic Floors And Floor Panels, B) Dismantling Of Suspended Ceilings, C) Reflection Of Loose Internal Plasters, D) Dismantling Of Floors From Ceramic Tiles And Wall Lifting, E) Dismantling Walls - Panel Wardrobes, F) Dismantling The Wall, G) Breaking Old Wallpapers, H) Disassembly Of Skirting And Faculty Strips, I) Dismantling Of Door Joinery With Frames, J) Disassembly Of A Dryer For Laundry, Curtain Rods, Internal Window Blinds, Etc., K) Disassembly Of The Electrical Installation, L) Dismantling Of Water And Water Installation, M) Removal Fittings, 2) Floor And Cladding Works: A) Formed The Inequalities Of Concrete, B) Execution Of Moisture Insulation In The Bathroom, C) Making Self -Leveling Screeds, D) Making A Floor Made Of Ceramic Tiles, Floor Panels. The Floors Should Be Made So That The Level In All Rooms Is Equal, E) Liating The Walls With Ceramic Tiles (Bathroom, Kitchen), 3) Masonry Works: A) Forging Holes And Shreds, B) Linteen Arrangement, C) Execution Of A Partition Wall, D) Housing Made Of Plasterboard, 4) Plasterboard (Walls And Walls And Walls Ceilings): A) Performing Ordinary Internal Plasters, B) Execution Of Internal Plaster Coats, 5) Painting Works: A) Wiping Existing Internal Plasters, B) Making Plaster Coats (Walls, Ceilings), C) Painting Walls And Ceilings, D) Cleaning Works, 6) Replacement Of Door Joinery: A) Delivery And Assembly Of The Door With Frames, B) Delivery And Installation Pvc, C) Marking Of The Entrance Door With The Number Of Premises And Replacement Of The Lock In The Box For Letters, 7) Finishing Works (Equipment): A) Installation Of Ventilation Grilles, B) White Assembly, C) Delivery And Assembly Of A Detached Gas Stove 4 Burner With An Electric Oven, D) Building Of The Smoke And Ricing Sensor, 8) Balcony: Barriers, B) Painting A Railing, 9) Export And Utilization Of Materials From Demolition. 2. Installation Works: 1) Water Supply And Sewage System: A) Execution Of The Water Supply System, B) Execution Of The Sewage System, C) Attempt To Tight The Installation, 2) Concealed Electrical Installation: A) Execution Of A New Electrical Installation With Accessories, B) Installation Of Housing Dash Intercom, E) Electrical Measurements, 3) Central Heating Installation: A) Dismantling And Assembly Of Existing Radiators, B) Dismantling Of Part Of The Central Heating Installation, C) Performing Part Of The New Central Heating Installation, D) Attempt At The Tightness Of Central Heating Installation, 4) Gas Installation: A) Dismantling And Re -Installation Of The Installation, B) Dismantling And Re -Assembly Of A Gas Boiler With Performing Approaches And Connecting To The Existing Air-Palin System Together With
|