3 128Gb Ram Ddr4 Rdimm, Possibility Of Installing Ssds, Hdd And M.2 Nvme In The Raid Configuration, Two Hot-Plug Power Supplies Max. 740W, Server Operating System Compatible With Windows Server Standard Core 2022 Or Equivalent; B) Router: Housing Max. 1U, Min. 4-Core 1.4 Ghz Processor, Min. 1Gb Ram, Min. 10 Ports 10/100/1000 Ethernet, Min. 1 Sfp+Port, Support For Ipsec, Performance Min. 67 Mbps When Encrypting Aes-128-Cbc + Sha1; C) Disk Matrix: Two Raid Controllers In The Active-Active System, Min. 16Gb Cache Per Controller, Service Min. 265 Disks, Installed Ssds 1.92Tb And Hdd 2.4Tb Sas, Possibility Of Creating Min. 512 Lun, Data Replication Support; D) Small Disk Matrix (Log Server): Nas Server With Min. 12 Pockets For Hot Disks, A Quad-Core 3.35 Ghz Processor, Min. 32Gb Ram Ecc, Raid And Virtualization Service.E) Hardware Firewall: Min. 10 Ports Of Gigabit Ethernet Rj-45, Ips, Vpn Service, Website Filtration, Network Traffic Monitoring, Anti-Virus And Anti-Spam Protection, Support For Dynamic Routing Protocols, Protection Against Ddos Attacks; F) Hardware Ups: Min. 800 Va / 480W, Maintenance Time 80% Load Min. 2 Minutes, Anti-Anti-Anti-Anti-Overload And Overload Protection, Acoustic And Optical Signaling. 1 User, Possibility Of Handling Min. 100 Devices, Operation Of Windows, Macos, Android, Ios, Two -Component Authentication; I) Service Keys For Authentication: Min. 20 Pcs, Service U2f, Fido2, Nfc, Usb 2.0, No Battery Need; J) External Disks: Min. 16Tb, Usb Interface 3.2 Gen. 1, Security Aes-256; K) Ups For The Office And Kindergarten: Min. 1200 Va / 600W, Min. 2 X Pn-E-93201 And 2 X Iec 320 C13 (10 A), Lcd Signaling; L) Switch For Kindergarten: Min. 24 Ports Gigabit Ethernet, 2 Sfp Slots, Service Management Via The Network Interface; M) Network Controller For Kindergarten: Min. 8X 10/100/1000 Mb/S (Rj45), 1X 10 Gb/S (Sfp+), Processor Min. 4-Core 1.7 Ghz; N) It Monitoring System: It Infrastructure Monitoring, Detection And Auditization Of Hardware, Software And User Activity, Remote Management And Access Control; O) Implementation: Assembly, Configuration, Integration And Tests Of Implemented Infrastructure, Post-Imagin Documentation. 2. The Contractor Undertakes To Provide And Implement The Necessary Licenses And Software Listed In The Description Of The Subject Of The Contract, Including: A) Server Operating System In Accordance With The Windows Server Standard Core 2022 Or Equivalent, With A License Covering All Cpu Cores In The Server; B) Virtualization Software With A License For Min. 5 Years Of Technical Support; C) Remote Desktop Software With A License For Min. 2 Years; D) Licenses For The It Monitoring System For Min. 60 Devices, Including Full Functionality Of The System; E) Licenses For A Firewall For A Period Of Min. 24 Months Covering Ips, Antivirus, Antypam, Web Filtering, Application Control, Sandbox Analysis. 3. The Supplied Hardware And Software Must Meet The Required Technical And Certification Standards (Iso-9001, Iso-1400
|