1. The Subject Of The Order Is The Reconstruction Of The Coal Boiler To Gasowa In Municipal Kindergarten No. 18 In Jaworzno At Ul. On Slopes 12. In The Scope Of Work There Is Also A Gas Installation From A Reduction And Measuring Point To The Reconstructed Boiler Room. Disposing Of Works In The Scope Of: 1) Sanitary And Construction: Disassembly Of Existing Solid Fuel Boilers (Eco-Peas)-One With A Power Of 68 And The Other 23 Kw, Along With Flights, Dismantling Of Pipelines Dn 65 For Manifolds, Assembly Of New Gas Boilers, Assembly Of A Hydraulic Clutch, Installation Of New Pipelines Connecting Boilers With Carbon Steel Manifolds, Thin -Walled Galvanized Outdoors, Assembly Of Necessary Devices And Fittings, Rinsing And Tightness Of The Heating System, Insulation Of Heating Cables, Start And Adjustment Of The Boiler Room. Accompanying, Construction: Door Buildings 90 X 200, Ei 60 (4 Pcs) In Place Of Existing Doors, Making Protection For Fire Resistance Class, Go Through The Walls And Ceilings Of Existing Installations, Local Plaster Repairs, Double Painting Of Walls And Ceiling With Washable Paints, Cleaning The Position Of Ceramic Tiles. Estalling The Gauze. At The Intersection Places With Existing Weapons, Execution Of Excavations And Drilling, Performing A Bedding In Excavations, Installation Of Pipelines In Excavations, Installation Of Fittings And Housing In The Cabinet Outside The Building, Piercing In The Walls, Assembly Of Pipelines And Fittings In The Building, Assembly Of Air And Exhaust Systems, Tightness And Strength Test, Covering, Excavations, Reproduction Of The Area Of The Area, Painting Pipelines, Assembly Of Boilers, Connecting Air -Flue Systems, Bricklaying, Starting The Installation. 2) Electrical Composition Of Internal Supply Lines, Assembly Of Prefabricated Electrical Switchboards, Execution Of Lighting Installations, Plug Sockets And Force, Mounted Cans, Laying And Mounting Cables, Installation Of Cable Tracks, Preparation. The Ends Of The Veins And Connecting The Wires, Assembly Of Basic Lighting Fixtures, Assembly Of 230V Plug Sockets, Connectors, Buttons, Assembly Of Evacuation Emergency Lighting, Execution Of Transitions Through Walls And Ceilings, Quality Control Of Materials, Quality Control Of Works. According To: 1. Technical Project: Reconstruction Of The Coal Boiler Room For Gas At Municipal Kindergarten No. 18 In Jaworzno At Ul. Na Stok 12 - Sanitary Industry, December 2024. Constituting Annex 1 To Swz, 2. Land Development Project And Architectural And Construction Project Construction Of Gas Installations At Municipal Kindergarten No. 18 In Jaworzno At Ul. Na Stok 12-Sanitary Industry, December 2024. Constituting Annex 2 To Swz, 3. Technical Project Construction Of Gas Installations At Municipal Kindergarten No. 18 In Jaworzno At Ul. 12 - Sanitary Industry, December 2024. Constituting Annex 3 To Swz, 4. The Technical Project Reconstruction Of The Coal Boiler Room For Gas At Municipal Kindergarten No. 18 In Jaw
|