The Tender Includes The Renewal Of The Rails And Two Switches Along The Wambeler Hellweg In Dortmund-Wambel In The Section Of The U43 Light Rail Line. The Conventional Dsw21 Track Structure Of The Solid Road Is Intended For Track And Course Renewal. This Consists Of A Bituminous Rail Infusion, Concrete Fulfillment, Asphalt Binder, Cast Asphalt Covering And Groove Rails Of The Profile 60R2 R200 On An Asphalt Layer. Extensive Soil Investigations Have Already Been Carried Out, The Results Of Which Can Be Viewed In The Ptm (23-6758) Company. Specifically, The Measure Includes The Renewal Of A Groove Rail Switch System Consisting Of Two Switches (See Location Plans) As Well As An Adjacent Double Track (65 M) And To Renewing Or Delivering Tracks (35 M) Of The Quality R200 At The Pothecke Stop (Wambeler Hellweg 165). In Addition To This, A Tube That Runs Parallel To The Track.
Contact Information
Contact Person
Frau Bertram
Address
Deggingstraße 40
Contact No.
+492319552272
Email
h.bertram@dsw21.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94229221
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.