The Subject Of The Investment Is Thermomodernization Of The Primary School Facility At Ul. Father Semraua 44 In Osiu On Plots With 3/1 And 4/1 Record Numbers. The Building Consists Of Two Adjacent Buildings. Building No. 1, Covered By The Thermomodernization Project, Is A Building Built In The 1990S. It Is A One-Story Building With A Partial Basement. The Building Has Didactic Rooms Of Primary School. Building No. 2 Is Not Covered By Thermomodernization And Does Not Constitute The Subject Of The Investment. The Property Is Fully Armed, Has Connections: Telecommunications, Electricity, Water Supply, Sewage And Heating. The Building Covered By The Development Was Included In The Low Buildings N (Height Up To 12.0 M). Building Area: 1200.07 M2. Total Area: 1304.79M2. Usable Area: 1095.26 M2. As Part Of The Designed Thermomodernization, The Following Scope Of Basic And Accompanying Works Was Designed: A) Insulation Of The Ceiling, Dismantling Of Existing Moisture Insulation From Foil, Insulation Of The Ceiling With Mineral Wool With Λ = 0.038, Gr. 15 Cm, Assembly Of New Vapor -Permeable Insulation, B) Insulation Of External Walls, Preparation Of The Substrate With Feature Repair And Supplementing Plaster Defects, Forms Of Plaster On Window Frames, Insulation Of External Walls With Foamed Polystyrene Boards Gr. 12Cm. C) Insulation Of The Plinth And Foundation Walls, Execution Of Excavations Revealing The Foundation Wall, Cleaning And Drying Of The Foundation Walls, Priming The Substrate, Making A Facets In The Corners Of The Bituminous Mass, Vertical Insulation From The Bituminous Mass, Assembly Of Eps Foameds For Foundations, Assembly Of The Bucket Branch, Performing Mosaic Plaster, Layers. Backfilling Of Excavations, D) Replacement Of A Glass Wall With Entrance Door, E) Installation Of Air Conditioning Installations, F) Installation Of Solar Installation, G) Accompanying Works: Disassembly And Re -Assembly Of Vertical Feasts Of The Lightning Protection System, Dismantling Of Existing And Assembly Of New Gutters And Drain Pipes, Impregnation Of Wooden Hood Components, Dismantling And Re -Assembly. Monitoring, External Lighting Replacement, Reconstruction Of The Roof At The Descent To The Basement, Renovation Of Balustrades, Plastering Of Chimneys, Demolition Of The Concrete Band At The Building, Making A Band 50 Cm Wide From Concrete Cubes. Note. The Contractor Is Obliged To Systematically Collect And Provide Information, Data And Documentation, Including Photographic, Which Confirms The Task In Accordance With The Dnsh Principle - The Principle Of Not Allowing Significant Damage To The Environment. The Contractor Will Certify That Purchased And Installed Devices At The Stage Of Delivery, Assembly And Operation Meet The Rules In The Scope Of Dnsh. The Heat Pump Should Meet The Requirements In The Scope Of The Priority Program B1.1.3 Exchange Of Heat Sources And Improvement Of School Energy Efficiency. The Removal Of Unnecessary Waste Generated During
|