1. Determining The Subject Of The Contract1) The Subject Of The Contract Is The Modernization Of The Culture Center In Many At Ul. Dąbrowska 32. The Work Outside Of The Building Includes: A) Replacement Of Window And Door Joinery.B) Installation Of External Window Sills. Mesh) F) Arrangement Of The Facade Structure In The Form Of Plaster. G) Exciting The Foundations Of The Building Along With The Purification. H) Insulation Of Foundation Walls With The External Structure. I) Performing Flashings Along With Glowing And Grooves .J). Execution Of Access And Access From The Processed Stone. Architectural.L) Cleaning Works.1B) The Scope Of Construction Works Inside The Building (Culture Center, Museum Of The Zaborska Land, Library): A) The Implementation Of The Mortars To Eliminate Indoor Defects. The Entire Building Is Insulated In Addition To The Insulated Part (For Painting Plaster In This Part In This Part In The Same Chosen Color By The Contracting Authority). A New Edge (Access To A Museum Building With The Width Set With The Employer, A Headband From The Front With A Width Of 1 M And On The Side At The Left At The Main Entrance With A Width Of 1 M. Museum (Color To Be Determined With The Employer). Inside The Building, Flatcakes, Removal Of Defects, Painting In The Selected Color By The Contracting Authority.- The Contracting Authority Recommends A Vision In The Field To Thoroughly Familiarize Itself With The Scope Of Works. Dąbrowska 32 Ornithological And Chipterological Opinion Was Made - Attached. I Am Asking To Read The Provisions Of The Opinion. At The Same Time, The Contractor Undertakes To Take Over The Renovated Building With Nature Supervision. In The Event Of Unintentional Destruction Of The Nest With Breeding, The Work Should Be Stopped And The Investor Immediately Call. Non -Compliance Is Obliged To Ask The Employer For An Explanation As Soon As Possible. In The Case Of Differences In The Field Of Technological Solutions (Including Used Materials And Devices), The Solutions Presented In The Construction Design, Bill Of Quantities And Additional Descriptions Are In Force. Names, Types And Origin In The Studies Are Not Binding On Contractors, 5) Contractors Are Obliged To Use Devices And Materials Corresponding To The Requirements Of The Polish Standard Transferring The European Standard Pn-En (Harmonized Standards) And Other Specified In The Technical Specifications Of The Performance And Receipt Of Construction Works And Project Documentation. The Contractor Is Required To Have Documents Allowing Their Use In Construction (Approvals, Certificates, Compliance Declarations, Quality Certificates) In Relation To The Materials And Devices Used. 6) Where The Origin (Brand, Trademark, Manufacturer, Supplier) Materials Or Standards Referred To In Art. 101 Para. 1-3 Of The Pzp Act, The Contracting Authority Allows The Offering Of Equivalent Materials Or Solutions. The Concept Of Equivalence Should Be Understood That They Guarantee The Implem
Contact Information
Address
Gmina Karsin,Karsin,83-440,Pomorskie,Pl637 - Chojnicki
Email
przetargi@karsin.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94181894
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.