3 Mineral And Bituminous And Auxiliary Materials, C) Cleaning Damaged Places From The Rumosz And Removing It Beyond The Road Lane, D) Heating Bitumen And Sprinkling The Repaired Place With Asphalt Emulsion With Edges, E) Spreading The Mineral And Bullshit Mixture In One Or Two Layers Depending On The Depth Of Damage, F) Compaction Mixtures, G) Sprinkling The Edge Of The Repaired Place, H) Carrying Out The Required Measurements. 2) On An Area Of About 2000 M2 In The Village Councils: Przygoń, Chechło, A Second, Puppet Puppet Performance Of Overlays Made Of Asphaltobeton Mass Of 4 Cm Gr 4 Cm According To The Following Technology: A) Preparatory Works And Marking Of Roads At The Place Of Planned Works, B) Purification And Equalization Of Places With Places Removal Of The Steed From The Road Lane) Delivery To The Construction Site Of A Mineral And Bullshit Mix And Auxiliary Materials, D) Sprinkling The Repaired Place With Asphalt Emulsion, E) Mechanical Spread Of The Mineral And Bullshit Mixture, 4 Cm Thick Layer After Thickening, F) Thickening Of The Arranged Mixture, G) Condensation Of The Edge, H) Submission Of The Road With A Traffic Lodge (0.5M Page), I) Conducting The Required Measurements. 3) On An Area Of About 317 M2, Execution Of Height Regulation Of The Pedestrian Route With Conventions In The Town Of Orpelów Commune Dobroń (It Is Necessary To Predict About 10% Percent Of New Materials To Perform The Work (Curb, Pavement Edge, Paving Stone). Scope Of Work: A) Dismantling Of The Pavement From Paving Stones (Materials For Re -Building) B) Dismantling Of The Pavement Edges (Materials For Re -Building), C) Disassembly Of Road Curves (Material For Re -Embedding), D) Setting), D) Road Curbs On The Concrete Bench) Setting The Road Edges On Cement And Sand Bed, F) Dehydration Culverts, G) Arranging Paving Stones On Sand-Cement Bed, H) Cleaning Of Ditches, Paying The Area In The Area Of Conducted Works. 2. The Scope Of The Subject Of The Contract Also Includes: 1) Organization Of The Construction Site, 2) Marking Of Places Of Renovation Works, 3) Bringing The Area After The Works To The Original State. 4) Removal From The Construction Site Of Unnecessary Elements And Materials That Can Create Obstacles Or Hinder Works, 5) Organizing The Area After Construction And All Other Works Not Covered In Swz, And Necessary To Be Carried Out Due To Construction Art, Or Applicable Law, 6) The Above Work Should Be Carried Out In Accordance With Applicable Technical Provisions And On Conditions Specified In The Contract, 7) Performing All Additional Activities Resulting From The Contract, 7) Adopted Technology Of Works.
|