Construction Work For Water And Sewage Pipelines - České Budějovice - Haklovy Dvory - Sewerage, 1 Stage. The Subject Of The Public Contract Is To Build New Sewers Of The Rainwater Sewer, Sewage, Sewerage Displacement, Pumping Stations And The Related Construction Of Sewerage Connections. Furthermore, There Are Relocations Of Water Supply Lines And The Connected Conversion Of Existing Water Supply Lines And Connections. The Subject Of The Filling Also Includes The Reconstruction Of The Roads Consisting Of A Complete Replacement Of Construction And Asphalt -Concrete Layers Of The Road, Including A One -Sided Sidewalk And Entrances To Existing Buildings, Dismantling The Existing And Building A Network Of New Public Lighting. The Sewer Is Designed As A Sewage Seapstone In Order To Drain Waste Water From Individual Properties And Rain Sewers For Rainwater Drainage From The Roads And Parts Of Real Estate. Building Buildings: So 000 Buildings Of Construction Site So 001 Preparation Of Construction Site So 100 - Road Buildings Incl. So 101 Culverts - Communication: Reconstruction Is Solved By 3 Branches Of Local Roads In Haklovy Courts. Within The 1St Stage, The Reconstruction Of The Branch “C” Will Be Solved In The Entire Length, And A New Bus Bay Will Be Built In The 1St Stage. Cancellation Of Existing Bay, Pedestrian Crossing Via Iii/14539, Building New Temporary Spins For Buses At The Point Of Connection Of Local Road To The Road Iii/14539 Including The Construction Of A New Bus Stop, Building 2 Pcs Of Slowing Prague And Adjacent Pavement, Reconstruction Of The A Branch. So 301 Sewage Sewage So 301.1 Sewerage Sewage Gravitational: Within This So Will Be Built Gravitational Sewage Sewers. Most Of The Village Is Captured By Gravitational Sewers. The Sectional Sewage Sewer Seduces Waste Water From The Local Part To The Three Lowest Sites, From Which It Will Be Pumped Through A Series Of Proposed Petrol Stations From Western Čs3 To The Northern Čs2 And Subsequently Drained To The Southern Čs1, From Which It Is Led East To The Existing Sewerage Network Of The Cc (Locality Zavadilka With Drain). Within The 1St Stage, A Sewer S-1 With A Length Of 305.83 M, Pvc Sn12. So 301.2 Sewer Sewage Connections So 302 Sewerage So 302.1 Sewerage Displacement: Within This So, Discharge Series Will Be Built For Waste Water Drainage From Individual Pumping Stations. 1. The Stage Includes The Construction Of A Sewer Displacement Kv-1 In The Length Of 855.86 M Led From The Čs1 In The Local Road North And Further East In The Field Along The Existing Gas Pipeline And Road Iii/14539 To The Part Zavadilka, Where It Connects To The Existing Pressure Sewage System Of The City Of The City. The Discharge Series Are Designed From The High -Dense Linear Polyethylene Pe100 - Sdr 11. So 302.2 Pumping Stations Sewerage Stations: 3 Pumping Stations Are Designed To Sewerage The Local Part. Cs1 Will Be Built Within The 1St Stage. So 302.3 Pumping Stations Electro Connection: For Each Petrol Station They Are Designed And Discussed By Nn Connections. Nn Connection To Čs1 Is
Contact Information
Contact No.
+420 386803219
Email
ledereroval@c-budejovice.cz
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94118320
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.