Detailed Scope Of Surface Work:- Usable Area Total: 168.69 M2- Volume: 532.72M3- Rooms: 3M And 3.26Mpilled Construction And Development Works: • Partly Demolition Of Walls In The Opening Zones For The Door, • Dismantling Of Door And Window And Facade Wings- Approx. 21 Pcs. Ceramic Tiles Floor - Approx. 138 M2, • Dismantling Of The Lastry Floor And Artificial Linings - Approx. 38 M2, • Effect Of Existing Floor And Wall Finishing Layers, • Disassembly Of The Existing Electrical Installation, • Dismantling Of Sanitary Installations, • Dismantling Of Radiators, • Debris, Planned Construction Works: A. Construction Works: • Construction And Reconstruction Of New Partition Walls, • Complements In Floors After Making New Installation Risers, • Assembly Of A New External And Internal Door Joinery - Approx. 12 M2, • Assembly Of A New Aluminum Window Joinery - Approx. 25 M2, • Installation Of Aluminum Walls With Doors - Appro Furrow For New Electrical And Low -Speed Installations, • Making Stoneware Floors Approx. 19 M2, • Pvc Layout Of Approx. 151 M2, • Making Stoneware Wall Cladding Approx. 64 M2, • Painting Works Approx. 645 M2, • Plastering Works Of Ceilings And Walls Approx. 702 M2, • Wallpaper - Approx. 96 M2, • Morticular Approx. 137 M2, • Assembly Of The Necessary Technical Infrastructure And Devices, • Complementary Finishing Works, B. Sanitary Installations- The Range Includes:- Installation Of Cold And Hot Water,- Sanitary Sewage System Installation,- System Of Condensation Sewage System From Air Conditioning,- Central Heating Installation,- Cooling Installation,- Exhaust Ventilation Installation, Central Heating Installation: • Renovation And Construction Works Related To The Installation Of Central Heating Installation (Piercing, Protective Sleeves, Wall -Up Of Building Partitions), • Installation Of Wall Heaters With Given Parameters, • Installation Of Installations From Copper Pipes For Central Heating Installations, • Connecting Existing Central Heating Divisions With Designed Radiators, • Installation Of Fittings, • Rinsing The Central Heating Installation. , • Execution Of Tightness Tests And Regulation Of The Entire Central Heating System, • Insulation Of The Central Heating Installation Cables. , Installation Of Cold And Hot Utility Water: • Renovation And Construction Works Related To The Installation Of Hot Water Installations. (Puncture, Insertion Of Protective Sleeve, Walling Of Building Partitions), • Installation Of Installations From Copper Pipes For Water Supply Installations, • Execution Of Approaches Under Domestic Hot Water Receivers. , • Execution Of Tightness And Adjustment Of The Designed Installation, Insulation Of Hot Water Pipes, • Supplying Cold And Hot Utility Water To Sanitary Supplies, Sanitary Sewage System Installation: • Renovation And Construction Works Related To The Installation Of Sanitary Sewage System Installation (Puncture, Insertion Of Protective Sleeves, Bricklaying Of Construction Partitions), • Install
|