1. The Subject Of The Contract Is The Replacement Of Window Joinery At The 1St High School In Leszno. 2. Determination Of The Subject Of The Contract According To, A Joint Dictionary Of Cpv Orders: 45000000-7-Construction Works, 45400000-1-Finishing Works In The Field Of Building Objects, 45421100-5-Installing Doors, Windows And Similar Elements, 45421000-4-Works In The Field Of Building Stool, 44221100-6-Windows, 452625222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222 Masonry Robots, 45442100-8-Painting Works. 3. Scope Of The Contract: The Subject Of The Contract Includes The Performance In Particular But Not Only, The Following: Demolition And Disassembly Works, Replacement Of Wooden Window Joinery With New Windows Made Of Pvc Profiles, Supply And Installation Of Windows, Delivery And Assembly Of External And Internal Window Sills, Masonry And Altal Work Related To The Treatment Of The Exchanged Carpentry, According To The Switching Of The Scope Works Presented In The Pre -Work Of Works, Detailed Technical Specification, Technical Description And Drawings, I.E. - Compressed Annex 9 To Swz. The Order Of Rooms That Will Be Excluded From Use Will Be Indicated By The Relevant School Head. 4. The Principles And Requirements Set Out In: A) Contract, Swz And The Contractors Offer, B) Technical Description And Drawings, C) Technical Specification Of The Performance And Receipt Of Construction Works, D) A Pre -Office Of Works, E) A Precipitation Of Works, Technical Provisions And Technical Knowledge, Taking Into Account The Conditions Of The Applicable Standards And Technical Knowledge Rules, Taking Into Account The Terms Of The Following Documents: 1) And Work Technologies Must Meet The Requirements Of The Technical Specifications Of Construction And Acceptance Of Construction Works And Applicable Standards; 2) Before Building Any Materials, The Contractor Will Show The Investor Supervision Inspector The Certificate He Used Construction Products Placed On The Market On The Principles Set Out In The Act Of 16 April 2004 On Construction Products (T. J. Dz. U. Of 2021, Item 1213); 4) The Contractor Generated During Works Will Be Developed. Utilization Should Be Carried Out In Accordance With The Provisions Of The Act Of 14 December 2012 On Waste (I.E., Journal Of Laws Of 2024, Item 1914) And Its Cost Include In The Offer Price. 5. The Employer Allows The Use Of Technical Materials And Devices Equivalent To Described In The Technical Documentation Attached To Swz, Constituting The Compressed Annex 9 To Swz. 6. The Contractor, Who Refers To Equivalent Solutions Described By The Employer In The Technical Documentation Referred To In Para. 5 Above, Is Obliged To Demonstrate In The Offer, In Particular By Means Of The Evidence In Question, That The Materials, Technical Equipment And Equipment Offered By Him Meet The Requirements Specified By The
|