Building Construction Work-Construction And Conservation Works In The Building Of The Hunting Palace In Julin As Part Of The Project Entitled Protection And Development Of The Cultural Heritage Of The Former Łańcut Ordinance Through Renovation, Conservation Works As Well As The Reconstruction And Creation Of Exhibition Spaces At The Hunting Palace In Julina Orka V In Accordance With The Co-Financing Agreement With Fepk.05.05-Iz.00-0005/23. 1. The Subject Of The Order Are Construction Works - Construction And Conservation Works In The Building Of The Hunting Palace In Julin As Part Of The Project Entitled Protection And Development Of The Cultural Heritage Of The Former Łańcut Ordinance Through Renovation, Conservation Works As Well As The Reconstruction And Creation Of Exhibition Spaces At The Hunting Palace In Julina Orka V In Accordance With The Co-Financing Agreement With Fepk.05.05-Iz.00-0005/23 For The Subject Of The Contract. Julina, Including: 1) Construction And Assembly Works Within The Building In The Field Of Structural And Finishing Elements, According To A Detailed Description In Swz And Construction, Executive Design, Stwior Specifications 2) Implementation Of The Full Range Of Conservation Work, Described In The Program Of Conservation Works And Project Documentation; Including: Maintenance Of Historic Mosaic Parquet, Paneling, Ceilings, Wardrobes, Chimneys, Chimneys Above The Roof, Tower-Latarnia, Balconies, Porches, Arcades, Architectural Details On The Roof And Facades; 3) Execution Of New Installations In The Building: Electrical A) Basic Lighting And Plug Sockets; Slongacular Installations: Lan, Cctv, Kd, Ssp, Fixed Firefighting Devices (Sug), Sswin, Visualization Of Sanitary Systems: Water, Hydrant, External Gas And Internal, Central Heating, Mechanical Ventilation, Air Conditioning, Fogging. 4) Anets And External Installations A/ Water Connection Brought From Plot No. 95 In The Edition To The Water Meter Designed At The Western Border Of The Plot B/ Water Installation On The Plot (Water For Fire Purposes-Hydrant Installation, Water For Social And Living Purposes In The Palace Building, Supplying Water To The Water Tank Of The Fog System C/ Glowing Installation Distributed Around The Palace Building. D/ Sanitary Sewage Ø 200 Pvc Discharging Sewage To The Existing Reservoir Of Permanent Waste (Zns); To The H/ External Tank H/ External Teletechnical Installation And/ Designed Fiber Optic Cables 4J J/ Designed Low Voltage Cables Nn 5) Technical Devices: Fire Tank, Fire Pumping Station, Tank (Buffer) For Rainwater, Fogging Installation Reservoir, Corner Valves Well, Water Melee Drainage On Sanitary Sewage-The Renovation Of The Existing Tank Or Replacement 6) Delivery-Delivery And Assembly Of A Lift For Disabled People, Delivery And Assembly Of Power Generator. 2
|