Kuuskijoki Kunto Ry Is Requesting A Bid For The Renovation Of The Construction Contract To The Kuusinki And Piilijoki River In Kuusamo In Accordance With And In Accordance With The Documents Attached To The Purchasing Notice. The Status Information Of The Site Is Shown In The Plans In The Attached Permit Application And Permit Decision. The Customer Is Undergoing A Project On The Kuuskijoki River In Kuusamo, Which Aims To Release Trout Rising In The Kuuskijoki River From All Obstacles To The Above Spawning Grounds. The Construction Contract To Be Purchased Must Coordinate With The Previous Plan For The Permit Application, The Design And The Renovation Work. In Addition, Construction Work Must Be Based On The Requirements Of The Water Act (587/2011) And The Project-Specific Requirements Specified In The Permit Decision In Accordance With The Water Act. The Contract Includes The Work Of The Northern Finland Regional Administration 17.2.2025 (Dnro Psavi/8392/2023). With Civil Engineering: Upper Channel Bottom Dam On The Myllykoski Power Plant-Piilijoki River Bottom Powder River Upper River-Pipelän-Patiplans-Patelähen-Time-Time Dams Above The Top Of The Upper Channel And The Installation Builded Workpieces 2 Work-Piilijoki River River Uoman Rinsing-Piilijoki River With A New Alignment To The Construction Of The Lower Channel-Virtausuoma In The Rocky Base At The Kilijoki Junction In The Kuusinjoki River-River River Rins Removing Half Of The Design Stones Below The Working-Time Dam Control And Pumping Behind The Top Channel Working-Time Damper Bottom Pumping Of The Site Of The Site Of The Site River Piilijoki Pähi-Piilijoki Design. Optiyjos During The Construction Contract, There Is A Need For Fish Flow, The Subscriber Acquires The Contract From The Winner Of The Tender During The Contract Period During The Contract: In The Order. The Preliminary Information On The Building Design Is Provided In The Construction Planning Notice Of The Building Design. The Contractor Selected As The Contractor Undertakes To Comply With The Permit Decision, Its Regulations And The Attached Drawings For The Work Of The Work, As Well As A Subsequent Contract, Which Is A Draft Attachment To The Contract And Other Subsequent Authorities, Decisions And Guidelines That May Be Issued. The Contractor Is Responsible For The Environmental Responsibility Of The Construction Contract During The Construction Contract Until The Client Has Approved And Received The Contract. The Procurement Is Covered By The Act 1397/2016 Of The Public Procurement And Access Agreements. The Value Of The Acquisition Above The National Threshold For Construction Contracts.
Contact Information
Contact Person
Kuusinkijoki Kuntoon Ry
Address
Kantvikintie 29 B
Contact No.
+358400354540
Email
matti.aikio@gmail.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94100301
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.