Construction Work - 100125 Skyburst Security Bispebjerg Cemetery (Bir29 And Bir30). 100125 Bispebjerg Cemetery (Bir29) And (Bir30): The Project Deals With Cloudburst Protection Of Bispebjerg Cemetery With A Focus On Delay And Drainage Of Cloudburst Water From A 100-Year Event. The Work Is Carried Out In The Central And Southern Parts Of The Cemetery, Including The Main Gate, The Valley And The Southern Area. Scope And Solutions: • Capacity: Delay Of 7,000 M³ Of Rainwater Via Green Lows, Underground Machines And Terrain Regulation. • Trees: Felling Of Approx. 160 Trees And Replanting Of 418 New Trees (Incl. Tulip And Cherry Alleys). • Infrastructure: Renovation Of Trails With New Curbs And Paving, Some Paths Are Converted Into Grass. • Construction Period: 2 Years Of Ongoing Access For Visitors And Minimal Disturbance Of Ceremonies. Area -Specific Measures: 1. The Main Gate: • Establishment Of Low -Rainwater Lows And Expansion Of Green Areas. • New Granite Pans And Renovation Of Existing Trails For Water Drainage. 2. The Valley: • Establishing Five Geometric Rainwater Basins With Terraces. • Installation Of Granite Stairs And Minimal Terrain Regulation To Maintain Access From Burial Sites. 3. • Replacement Of Older Avenues With New Types Of Wood And Installation Of Machines • Protecting Selected Grave Sites With Steel Edge To Prevent Flooding. Special Requirements For The Contractor: • Respect For The Cemeterys Function As An Active Burial Ground With Ongoing Ceremonies. • Protection Of Existing Burial Sites During Construction Work. • Integration Of Construction Solutions Into The Existing Landscape Architectural Design. • Compliance With Environmental Considerations And Protection Of Biodiversity. • Ensuring Access Conditions For Visitors Throughout The Construction Period. • The Project Is Designed In Stages So That Parts Of The Cemetery Can Be Used Continuously. The Project Must Be Implemented With A Focus On Preserving The Cemeterys Cultural -Historical And Aesthetic Values, While Also Creating Robust Solutions For The Rainwater Management Of The Future. The Construction Work Is Carried Out As A Main Contract In The Period Mid -2025 - Mid -2027.
Contact Information
Address
Islands Brygge 37
Contact No.
33665600
Email
xk1x@kk.dk
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94085537
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.