Construction Work - Kra Renovation Gschg - Los 1, Builder. Project Description Of The Government Council Decision (Rrb) No. 2016-000704 Of June 22, 2016, Sbb Ag, Based On Art. 10 Of The Federal Law On Fisheries (Bgf), Hires To Renovate The Frenzy Of Fish At The Machine House And The Rupperswil-Auenstein Power Plant (Kra). The Current Project Comprises Two Sub-Projects: * Tp B: Fish Descent At The Endowment Power Plant Using A Flat Inclined Vertical Fish Meal With Bypass Line Into The Existing Bypass Clock * Tp C: Fish Climb At The Machine House By Means Of A Combination Of Vertical Slot Pass And Raugerinne-Based Passport With Two Entries On The Left Bank The Los 1 Concerns The Construction Work For This Project. Further Lots (Steel Water Construction, Control, Attraction,…) Are Advertised Separately. Planned Construction Work For The Fish Descent Doctoral Power Plant (Tp B) * Fish Protection: The Fish Protection At The Endowment Power Plant Is Guaranteed Via A Flat Inclined, Vertical Fish. * Calculation Machine: The Rake Is Equipped With A New Computing Cleaning Machine. * Branching Structure: The Fish Access The Existing Sink And From There Into A Newly Created Branching Structure (Drain Approx. 520 L/S). A Vertical Steel Flap Directs The Water Either To The Bypass For The Fish Descent (Normal Operation) Or To The Existing Sink Canal (Rinsing Operation). The Water Level In The Branch Structure Can Be Regulated Via A Horizontal Steel Flap In The Bypass. * Dambalken: New Dam Beams Are Necessary At The Upper Water Side At The End Of The Inlet Canal To The Endowment Power Plant In Order To Replace The Current Position Of The Dam Beam Degree. * Building Adjustments In The Inlet Canal Of The Died-Up Power Plant Planned Construction Work For The Fish Climbing Machine (Tp C) * Fish Climb: The Fish Climb Is Carried Out Using A Combination Of Vertical Slot Pass And Raugerinne Basin Pass With Two Entrances On The Left Bank. * The Control Flow Is Generated By Means Of An Attraction * The Steep Bank Embankment Requires Comprehensive Civil Engineering Work With Dissolved Drilling Pile Walls, Earth-Reinforced Systems And Water Posture * For The Inlet And Exit In The Lower And Upper Water, The Existing Bank Wall Must Be Broken Out * Control Of The Existing Tuff Grave
Contact Information
Address
Hilfikerstrasse 3
Contact No.
+4179000
Email
vanessa.muller@sbb.ch
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94085024
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.