Building Demolition And Wrecking Work And Earthmoving Work - Development Of The Old Location Meisenburg In Schmallenberg, Los 1: Demolition, Dismantling And Pollutant Renovation. As Part Of The Area Development Of The Former Production Location For Textiles From Falke Kgaa In Schmallenberg, The City Of Schmallenberg Intends To Renovate And New An Area Of Around 7 Hectares. The Work To Be Excited With Los 1 Includes The Dismantling Of The Existing Former Production Halls, Building Complexes And Fortified Areas To Prepare The New Development Of A New Commercial/ Industrial Area. With The Dismantling Of The Existing Halls, Buildings And Structural Facilities, The Existence Of Hazardous Substances Determined As Part Of The Building Exploration And Material Tests Is An Extensive Building System (Asbestos Containing Asbestos, Kmf, Etc.). 1 Psch Construction Site Device 1,000 M Construction Fence And Hold 1 Psch Waste Water Transfer 90 M Channel Construction Dn 400 650 M2 Protective Wall 42,000 M2 Clearing Out Building Complexes 7.600 M2 Disassembly And Disposal Of Pollutant Polluted Roof And Ceiling Cladding 3,000 M2 Dismantling And Disposal Lightweight Walls And Disposal Of Light-Use Clutches 235,000 M3 Remaining Core Of Building Complexes 1,700 M2 Disassembly And Disposal Of Asbestos -Containing Roof Coverings And Facade Cladding 8,000 Lfdm Expansion And Disposal Of Asbestos Containing Asbestos And Glass Clamping Strips 2,300 Pieces And Disposal Of Asbestos Containing Asbestos (Cable Flanges) 29,600 M2 Expansion And Disposal Of Asbestos -Containing Industrial Screed 26.400 M2 Expansion And Disposal Of Asbestos-Containing Wall Plasters 310 Lfdm Expansion And Disposal Of Asbestos-Containing Ventilation Channels 3 Pieces Of Disassembly And Disposal Of Steam Boilers 2,800 Lfdm Disassembly And Disposal Of Pipe Insulation With Kmf-Insulation Fabric 1,900 M2 Disassembly And Disposal Of Kmf Insulation Positions On Ceilings. Disposal Of Ventilation Systems 36 Pieces Of Disassembly And Disposal Of Other Technical Systems (Control Cabinets, Transformer, Etc.) 38,500 M2 Disassembly And Disposal Of Non-Pollutant Roof Coverings 236,000 M3 Of Static Building (Buildings, Halls And Industrial Chimney) 400 M3. 32,000 To Preparation Of Building Rubble To Rc Material 2,500 M3 Excavation Of Contaminated Floors 10,000 M3 Installation Of Rc Material 2,000 Tons Of Non-Dangerous Soil Excavation 9,300 To Mixed Rubble Dispose Of 8,000 To Expansion 1 Psch Disposal Of Different Types Of Waste (Polystyrene, Pcb, Asbestos Waste, Waste, Etc.)
|