1 A) Construction Works. Completing Construction Works Based On The Construction Project Of The Construction Of A Municipal Building In Daszyna 28. The Scope Of The Expected Works Includes Works Included In The Above-Mentioned Design Study, Consisting In Particular In: External Walls, Internal, From The Ceiling Level On The First Floor- Ceiling Above The First And Second Floor, Roofing Staircase Above The Level Of The Ceiling. Floor On The Ground - Insulation, Screed, Cladding - Window And Door Joinery - Facades - Driveway For The Disabled, Passenger Lifts - Finishing Construction Works - Interior Electrical Installations, Lighting Installation, Plug Sockets, Ict And Telephone, Electricity, Rtv, Intercoms, Lightning And Grounding. Sanitary - Sanitary Sewage System (Except For The Installation Distributed Under The Building, Cold Water And Cwu, Central Heating, Internal Gas, Gas Boiler Room - Land Development, External Electrical Installation - Restoration Of The Surface Of The Weight !!! The Investment Is A Continuation Of Construction Works. So Far, Earthworks, Foundations, Floors On The Ground To The Insulation Level With The Distribution Of The Sewage System, Masonry Works Of The Ground Floor And First Floor To The Level Of The Ceiling Above The First Floor, Excluding Partition Walls; Connections: Gas With A Reduction And Measuring Point, Water, Sanitary Sewage System. In Addition, The Contracting Authority Has A Partially Purchased Material - 1152 Pcs. H+H 24 X 24 X 59 Cm Concrete Blocks And 240 Teriva Ceiling Blocks, Which Should Be Used For Further Implementation. The Detailed Scope Of Works Remained To Be Carried Out Is Determined By The Cost Estimate. The Works Remaining To Be Carried Out Should Be Carried Out On The Basis Of The Project Documentation Owned By The Employer. The Contracting Authority Also Requires:- Developing Possible Projects And Incurring The Costs Of Seizing The Road Lane- Developing Projects Of The Construction Organization And Technology Of Works- Developing All Documents Necessary To Obtain Permission/ Notification For Use, Including Inventory And As-Built Documentation Containing All Certificates Of Admission And Origin, Approvals, Etc. Such A Requirement),- Study, In Consultation With The Employer, A Financial And Substantive Schedule For The Implementation Of Construction Works; Taking Into Account And In Accordance With The Requirements Of Institutions Co -Financing The Investment. It Is Necessary To Cooperate With Administrative Bodies In Order To Obtain Relevant Decisions, And In Particular Participate In Public Consultations, Provide Explanations At The Request Of The Authority, Submit Applications And Documents Immediately In Relation To The Applicable Deadlines. The List Of Documents Contained Above Does Not Limit The Obligation To Prepare Other Documents Of The Contractor Necessary For The Execution Of Construction Works Included In The Subject Of The Contract. Each Of The Abovementioned A Set Of Documents
|