The Subject Of The Contract Is The Warming Of The Building Of The Village Common Room In Głuszyn, Together With Accompanying Works And The Execution Of External Stairs, In Particular: Dismantling Of The Existing Section Of Foam Insulation With Plaster, Dismantling The Wooden Soffit, Dismantling Of Sheet Metal Treatment And Roof Above The Entrance From The Sheet, Dismantling Of The Sheet Metal, Dismantling Of Rings And Drain Pipes, Forging From The Wall Of The Window And Wooden Doors, Installation Of Pvc Window And Door Joinery With Aluminum With Filling, Planting Prefabricated Steel Window Sills, Insulation Of The Facade Facade With Polystyrene Thickness 15 Cm (And 10 Cm In The Case Of The Plinth) With A Coefficient Λ = 0.032W/M*K Or Smaller With The Preparation Of The Substrate A Metal Angle And Mounting Of A Plinning Strip, Execution Of A Facade Expedition From Resin Plaster On A Pedestal, Execution Of A Facade Plaster From Thin -Layer Silicone Plaster On The Facade, Performing New Machining From Galvanized Steel Sheet, Supplementing The Tube And Covering The Roof Over The Input Of The Roofing Sheet, Installation Galvanized Steel Sheet, Laying The Roof Soffit Made Of Plate -Like Panels, Assembly Of Roofing Above The Side Entrance Of The Smoky Polycass, On The Aluminum Structure, Making External Stairs Made Of Paving Stones Gr. 6Cm With The Foundation And The Edges. Additional Requirements For Works Covered By The Subject Of The Contract, The Contractor Will Guarantee For A Minimum Period Of 3 Years, A Maximum Of 5 Years From The Date Of The Final Acceptance Protocol, All Materials Used To Perform The Subject Of The Contract Must Be In The First Species And Must Have Approvals, Certificates And Technical Approvals Allowing For Use In Construction (Approvals, Certificates And Approval At Least Technically Equivalent To Devices Adopted In The Pre -City Pre -City. It Is Necessary To Include The Costs Of Marking, Securing And Conducting Works, The Contractor Bears Full Responsibility For Any Damages And Losses Resulting From The Works, The Contractor Shall Clean The Construction Site And The Area Adjacent To All Fragments Of Debris, Foamed Polystyrene, Door And Window Sodium And A Wooden Soffit Familiarizing Yourself With The Area Where The Works Will Be Carried Out. The Subject Of The Contract Should Be Completed In Particular In Accordance With: 1) By The Act Of 7 July 1994 Construction Law (I.E., Journal Of Laws Of 2024, Item 725, As Amended), 2) By The Regulation Of The Minister Of Infrastructure Of April 12, 2002 On The Technical Conditions To Be Met By Buildings And Their Location (I.E., Journal Of Laws Of 2022 As Amended), 3) By The Act Of 16 April 2004 On Construction Products (Journal Of Laws Of 2021, Item 1213), 4) A Predetermination Of Works And A Detailed Technical Specification 5) All Necessary Provisions In The Field Of Lawyer, Health And Safety And Fire Protection And Fire Protection, Environmental Protection And Applicable Technical
|