En26tgf004 - Bridge Yard . The Proposed Contract Is For The Loading/Unloading Of Bcts Bridge Structures And Associated Bridge Materials (E.G. Bridge Mods, Guard Rails, Riser Blocks, Sill Timbers, Culverts, Etc.) And Snow Removal At The Bcts Windy Point Bridge Yard, Located At 1.5 Kilometre On The Finlay Fsr On An As And When Requested Basis. Services Will Be Provided To The Bcts Engineering Program And Timber Sales License Holders Requiring The Above Materials. The Majority Of Lifts Will Be 12,000 Kg Or Lower, More Than One Machine May Be Required To Carry Out The Task And To Prevent Damage To The Structure(S) As Per Worksafe Bc Lifting Plans Are Required To Be In Place For All Materials Being Loaded/Unloaded. All Lifting Chains/Straps Must Meet The Weight Requirements For The Weights Of The Materials Being Loaded/Unloaded. All Bridge Structures Must Be Lifted Into/Out Of Their Storage Place And Must Not Be Dragged. Additional Works May Include The Laying Out Of Bridge Structures For Maintenance Works Prior To Being Reassigned To The Field.
Contact Information
Email
Forests.PrinceGeorgeTimberSalesOffice@gov.bc.ca
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 93976110
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.