The Subject Of The Planning And Construction Monitoring Performance Is The Repair Of The Military And Schleusenbrücke In Stuttgart-Hofen With The Aim Of The Bridge For Traffic To Be Able To Use Further Time. The Original Load -Bearing Capacity Should Continue To Be Ensured. The Lock Bridge Was Built In 1957 As A 2-Cell Hollow Box. The Bridge Is Pre-Tensioned Using The Baur-Leonhardt Process In The Tension Block Process. The Span Of The Lock Bridge Is 35.55 M. The Hollow Box Has A Clear Height Of Approx. 1.60 M Inside. As Part Of The Renewal Of The Overbuilding Of The Wehrbrücke, The Lock Bridge Was Widened In 1985 Towards Underwater. The Lock Bridge Spans The Neckar And Connects Hofen With Mühlhausen. This Bridge Is The Only Way To Cross The Neckar In The East Of The City! Two Light Rail Tracks With Close Timing Of The Lines U12 And U14, Two Vehicle Traces And Two Pedestrian Paths Lead Over The Bridge.
Contact Information
Address
Hauptstätter Str. 66, 70178, Stuttgart
Email
65-8DLZBau@stuttgart.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 93975793
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.