The City Of Greven, Technical Company Greven, Rathausstraße 6, 48268 Greven, Intends To Demolish The Pavilion Buildings On The School Premises Of The Augustinianumin 48268 Greven. Pavilion A Is Broken Off First, This Construction Work Is To Be Carried Out From April 10, 2025. The Previous Calendar Week Can Be Used For The Construction Site Facility After Coordination With The Client And The School. The Pavilion D Was Examined In The Course Of The Current Dismantling Measure, But The Demolition Will Only Be Carried Out Later At A Time That Has Not Yet Been Specified. The Demolition Of The Pavilion D Is Not Part Of The Present Tender. The Construction Task Is That All Components Related To The Pavllion Are Canceled And Disposed Of. Before The Conventional Demolition Work Of The Mineral Building Fabric Is On The Basis Of The Work And Immission Protection Law As Well As The Circulatory Management And Waste Law As Part Of The Pollutant Renovation And Gnawing. To Carry Out Building Materials. The Dismantling Is Carried Out With The Aim Of Adding The Construction And Demolition Waste That Are Usable, If They Can Be Used, Quality-Appropriate As Secondary Building Materials Of The Market Economy. With Regard To The Chemical Quality Of The Mineral Fractions That Arise In The Termination Due To The Construction Of The Pavilion Due To The Construction Of The Pavilion, From Unnormal Recovery (Installation Class To Z 1.2 According To Laga-Mempresses 20, Tr Recycling Building Materials, 1997) Or Rcl I Nachrc Directive (2001). Taking Into Account The Replacement Building Materials Regulation (Replacement Building Material, Ebv) Means A Classification In The Installation Class Up To Rc-2 (Annex 1 Tab. 2 Ebv) And Compliance With The Monitoring Values For Rc Building Materials (Annex 1 Tab. 2.2 Ebv). With An Increased Proportion Of Concrete, The Parameter Is Not Taken Into Account As Typical Of The Material. It Is Not Possible To Manufacture Rc Material On Site. The Mineral Building Fabric Must Be Crushed To A Size To Be Loaded (If Necessary After The Requirements Of The Selected Disposal Point) And An Acceptance Point Or Processing Point. The Underground Components Of The Building, I.E. H. The Mineral Building Fabric Below The Top Edge (Gok) In The Form Of Foundations And Floor Slabs Must Be Taken Up Completely After Dismantling The Above -Ground Building Fabric. The No Longer Used Supply And Disposal Facilities Including Shaft Structures, Lines And Channels On The Property Must Be Recreated Up To A Transfer Point That Is Coordinated With The Client According To The State Of The Art And, If Not Yet, To Secure Medium-Oriented. The Working Pits, Foundation And Line Trenches Must Be Installed After The Absorption Of The Floor Plates, Soles, Foundations And Infrastructural Facilities With Unencumbered, Foreign Substance-Free, Comprehensive Filling Sand Up To 0.35 M Under The Surrounding Edge Of The Terrain, So That It Can Be Built On A Sustainable Surface. Unencumbered Filling Sand Without Foreign Substances Of The Installation Class Z 0 According To The Lagam Inauguration 20, Tr Boden (2004), Or Bm-0* Ann. 1 Tab. 3 Ebv Or Grown Foreign Fabric -Free Filling Sand Made Of Sand Pits With A Proof Of Origin Can Be Compacted In The Construction Pit (Evd = At Least 50 Mn/M2).
Contact Information
Contact Person
Fr. Möcklinghoff
Address
Rathausstr. 6
Contact No.
+492571920338
Email
vergabe@stadt-greven.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 93974616
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.