3 Abraham 58 In Gdańsk. 2. Classification Code For The Common Order Dictionary (Cpv): 45111300-1, 45262310-7, 45262300-4, 45262500-6, 45410000-4, 45320000-6, 45432130-4, 45421152-4, 45421146-9, 4542100-8, 45421000-4, 45421160-3, 45330000-9, 45331100-7, 45332000-3, 45332400-7, 45232141-2, 45343000-3, 45331000-6, 4531210-1, 45331230-7, 45311200-2, 45310000-3, 45317300-5, 45311000-0, 45316000-5, 45312100-8.3. The Scope Of The Subject Of The Contract Includes: 1) Comprehensive Execution Of Construction Works Consisting In Changing The Use Of A Room For Bicycles And A Dry Ice Generator For Waste Rooms: Biological, Chemical And Medical In The Building Of The Inter -University Biotechnology Department Of The University Of Gdańsk And The Medical University Of Gdańsk At Ul. Abraham 58 In Gdańsk, In Accordance With The Description Of The Subject Of The Contract - By Annex 5 To Swz, 2) Providing Service Services, Inspections And Maintenance Of Devices, Systems, Installations And Construction Equipment (Door Joinery) Together With Consumable Materials, Whose Servicing, Inspection And Conservation Required By The Provisions And Recommendations Of Manufacturers To Maintain Constant Efficiency And Maintaining Warranty Conditions - In Warranty Period. The Minimum Scope Of Work And Time -Related Times Related To The Service, Review And Maintenance Are Included In The Table In Chapter Vi Point 1 Of The Description Of The Subject Of The Contract - Annexanr 5 To Swz, Which Is A Collective Matrix Of Service And Maintenance Activities. Matrix, Is Obliged To Draw Up A Written Schedule Specifying The Detailed Dates Of Conducting Activities Indicated In The Matrix. The Schedule Prepared For The Contractor, Hereinafter Referred To As The Schedule Of Service And Maintenance Activities, Requires Acceptance Of The Ordering Party. Service And Maintenance Schedule The Contractor Is Obliged To Transfer To The Employer Along With The Termination Of The Completion Of Works. 3. A Detailed Description And Scope Of The Subject Of The Contract Is Determined By The Description Of The Subject Of The Contract - Annex 5 To Swz.4. The Bill Of Quantities, Which Is Annex 8 To Swz, Should Be Treated As An Auxiliary Material. The Risk Of Determining The Bill Of Quantity And Costs Of Performing The Subject Of The Contract Shall Be Borne By The Contractor. 5. Information On The Subject Of The Contract Contained In Any Document Is Considered To Be Binding. All Documents Should Be Treated As Mutually Complementary And Mutually Explaining. 6. The Contractor Is Obliged To Exercise Caution In Conducting Works, In Particular To Ensure Their Proper Security, Supervision Of The Works Area During The Works, Keeping The Area Of The Works In The Right Order. 7. The Works Will Be Carried Out In An Active Facility. Loud And Burdensome Robots For The Environment Will Be Able To Be Carried Out After A Written Consultation With The Contracting Authority. You Should Take Into Account The Need To Work At Exten
|