1. The Subject Of The Order Is The Implementation Of The Investment Task Consisting In The Construction Of Zachodna, Broniewskiego And Dolna Streets In Starogard Gdański. 2. The Subject Of The Contract Includes Construction Works: 1) Road Industry; 2) Sanitary Industry; 3) Power Industry; 4) Teletechnical Industry; 5) Shaping Green Areas, General Construction And Small Architecture; 6) Other Works Necessary For The Correct Implementation Of The Subject Of The Contract. The Contractor Bears Full And Total Liability For Correctly Fulfilling The Subject Of The Contract From The Moment The Contract Is Signed To The Expiry Of The Warranty Period For The Subject Of The Contract. 3. The Detailed Scope Of Works Is Presented In The Technical Documentation That Is An Attachment To Swz. 4. Note: 1) Technical Documentation Constituting An Attachment To This Swz Has Been Drawn Up For A Wider Scope Of Works Than The Subject Of This Contract, The Attachment Shows Graphically The Scope Of The Subject Of The Contract, Therefore In Connection With The Above When Preparing The Offer And Valuation Of Works, The Remaining Scope Of Works Should Be Omitted; 2) Mineral And Bullshit Surfaces Adopted In The Project As The Abrasive Layer Ac 11 S50/70 Change To The Sma 8; 3) Pedestrian And Bicycle Route Surface From The Concrete Cube To The Ac16w Asphalt Concrete In Two Layers 4+4 Cm With Sprinkling The Foundation From The Aggregate And The 1St Layer Of Asphalt Concrete; 4) The Attached Grasseles Only Perform An Auxiliary Function In Pricing By The Contractor. 5. Additional Requirements: 1) The Designed Audit Wells For The Rainwater Sewage System Being Built Should Be Equipped With Cast Iron Hatches With A Logotype In Accordance With The Attached Patterns; 2) Existing Inspection Wells For The Sanitary Sewage System Being Built, The Class D400 Cast Iron Hatches With The Logotype Should Be Equipped With The Attached Patterns; 3) Such As Wells, Inlets, Hatches, Chambers, Etc. (Applies To All Technical Weapons At The Construction Site) Resulting From The Works Carried Out And Necessary For Proper Implementation Of The Project, This Position Should Include The Replacement Of All Hatches, Covers, Boxes On The Existing Infrastructure Not Provided For Reconstruction; 4) You Should Design And Illuminate Pedestrian Crossings In Accordance With Current Storage In Places Marked In Places Marked In Places On The Land Development Plan (Scope Of The Subject Of The Contract); 5) Led Lighting Fixtures Should Be Used With The Possibility Of 3 Degrees Of Power Reduction With A Loaded Reduction Program By 30% In Hours. From 23.00 - 5.00, With Zhaga Sockets, Luminaires Must Have Enec, Enec+, Zd4 And Remote Control Without Additional Modification Of The Binding; 6). Make (Equip) All Areas Of Pedestrian Crossings With Integration Tiles In Accordance With Current Guidelines; 7) Yomb And Road Plates (Suitable For Re -Assembly) The Ordering Partys Instructions - The Contractor Will Value Them Again,
Contact Information
Address
Gmina Miejska Starogard Gdański,Starogard Gdański,83-200,Pomorskie,Pl638 - Starogardzki
Email
zamowienia.publiczne@um.starogard.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 93970378
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.