1) The Subject Of The Contract Is The Modernization Of Structural And Electrical Wiring Installation-Design And Implementation Of Structural Wiring Installations, Pel Electrical And Logical Points With 230V Power Supply, Ict Switchboards With Fiber Optic Connections And Tb Electric Switchgears In The Building Of The Faculty Of Science And Technical Sciences At Ul. Będzińska 39 In Sosnowiec. 2) The Scope Of The Order Includes: A) Development Of Project Documentation Taking Into Account:- Modernization Of The Structural Installation Of The Building,- Construction Of Pel Electrical And Logical Points Together With 230V Power Supply And Date,- Reconstruction Of Existing Tb Electric Switchgears,- Construction Of Cable Routes,- Construction Of Installation Channel Routes,- Construction Of Ict Wardrobes,- Construction Of Networks Using Cable Connections Using Cable Connections Using Cable Connections Using Cable Connections. Fiber Optic,- Construction Of A Wireless Network,- Construction Of Cabling Connections And Sockets For Projectors (Hdmi Installation),- Construction Of Structural Sockets And A Date For Printers,- Dismantling Of Old Cable Routes, Installation Channels And Wiring,- Adaptation To The Current Regulations Of The Room Intended For Server Rooms,- Performing The Necessary Arrangements, B) Decisions, C) Execution Of Works In Accordance With The Prepared And Agreed Project Documentation, D) Delivery And Installation Of Passive Elements Of The Network, E) Execution Of Specialized Measurements And Control And Measuring Documentation, F) Preparation Of As-Built Documentation. 3) Under The Subject Of The Contract, The Contractor Should Also: A) Exercise Authors Supervision, B) Training Min. 3 People From The Personnel Of The Ordering Entity From The Service And Maintenance Of Built-Up Systems, Installations And Devices, Under The Conditions Included In The Contract. 4) The Detailed Description Of The Subject Of The Contract Is Included In The Functional And Utility Program (Pfu), Constituting Annex 2 To Swz Together With Annexes 2.1, 2.2 And 2.3, I.E. Design Concept, Quantitative Concept, Existing Status, Existing Structural Wiring), Which Documents Together With The Contract Should Be Considered Together. Above Documents Are Complementary Documents. All Construction Works And Other Activities Included In Pfu Or In The Contract, Respectively, Should Be Treated As If They Were Included In Each Of The Documents Listed. The Contractor Is Obliged To Perform All Works And Activities Provided For In The Detailed Description Of The Subject Of The Contract, As Well As Those Not Indicated As To The Name, And Necessary To Complete The Implementation Of The Subject Of The Contract. 5) Whenever In Pfu And Attachments To It We Talk About Documents Confirming The Fulfillment Of The Requirements And Standards For Materials, Devices, Etc. These Are Not Documents Required In This Public Procurement Procedure. If They Are Submitted Together With The Offer, They W
|