1. The Subject Of The Contract Is The Execution Of Construction Works Involving The Construction Of A Nursery Building Together With The Necessary Construction Equipment On Plots Of Land No. 5989/3, 5990 And 6144 In Niedźwiad, Area Buildings 583.6 M2, And The Cubic Capacity Of 3406.80 M3, Co -Financed By The European Union Under The European Funds Program For Social Development 2021 - 2027 Pn. Program For The Development Of Childrens Care Institutions Up To The Age Of 3 Active Toddler 2022–2029. 2. The Subject Of The Contract Includes: 1/ Construction Of A Nursery Building Together With Construction Installations And Devices, In This Eternal Sections Of The Internal Installation: Electrical Inventory, Sanitary Sewage System To The Designed, Temporary, Drainage Tight Tight Tank For Liquid Impurities With A Capacity Of 20 M3, Construction Of The Installation Of Rainwater Drainage Sewage System For A Sealed, Drainage, Retention, Retention Tank For Rainwater With Capacity With Capacity 35 M3 And Internal Installations: Water And Sewage, Gas, Mechanical Ventilation, Air Conditioning, Ict, Supervisory, Video Intercom, Solar And Lightning Protection, Construction And Assembly Of Elements Of Small Architecture In A Public Place (Playground), Paved Surfaces, Parking Spaces. 2/ Expansion Of The Water Supply Network Together With The Construction Of A Water Supply Connection, 3/ Reconstruction Existing Congress And Construction Of A New Congress. 3. For Safety Reasons, During The Implementation Of The Task, The Area Where The Works Will Be Carried Out From Use By Fencing And Marking Warning About The Construction Works Carried Out. 4. The Area Where The Works Will Be Carried Out Adheres To The Primary School And The Associated Parking Lot Located Along The Access Road To Construction. Particular Caution Should Be Exercised In Periods Before And After Class When Increased Car Traffic And Pedestrian Traffic Takes Place On The Road, And The Supplies Of Materials For Construction Should Be Organized In Periods Not To Conflict With Pedestrian Traffic On The Road In Front Of The School. Work Should Be Carried Out In Such A Way That They Do Not Prevent Or Make It Difficult To Use Primary School. 5 In The Event Of Unidentified Field Collisions, The Inability To Perform The Task In The Adopted Works Technology Or Other Events Preventing The Performance Of The Subject Of The Contract According To The Solutions Adopted In The Design Documentation, The Costs Of Possible Spare Solutions Are On The Side Of The Contractor. 6. Under The Contract, The Contractor Is Also Obliged, Among Others To: 1/ Ensuring Geodetic Service, Including Before Commencing The Works For The Geodetic Arrangement Of Works And Notification To The Employers Representative And The Supervision Inspector For Receipt, 2/ Execution Of The Geodetic Inventory Of The As -Built The Subject Of The Contract, 3/ Performance Of The Necessary Attempts, Tests, Measurements, Security, Inclusion And Technical Accep
|