The Subject Of This Order Is The Reconstruction Of Two Classrooms In This Physical And Chemical Room And Administrative Rooms (School Management Office) And Nurses Office In The Building Of The School And Preschool Complex No. 2 In Jaworzno At Ul. Broil 101. Conclusion Of Works In The Scope Of: 1. Construction: Demolition Works Include: Disassembly Of The Existing Door Joinery According To The Design, Disassembly Of Carnisha Mounted On The Ceiling In Renovated Rooms, Dismantling Of The Existing Wooden Paneling In The Communication Room, Dismantling Of Partition Walls In Accordance With The Design, Demolishing The Existing Chimney In Accordance With The Design, Buying New Door Openings In Load -Bearing Walls. Renovation Covers Include: Installation Of L Lintels, Bricking Up Unnecessary Door Openings In The Load -Bearing Walls, Breaking Existing Floors And Screeds, Securing The Remaining Chimney Over The Flat Roofs, A Steel Sheet Rooted Inside The Room, Screwed To The Ceiling In Accordance With The Design, Making New Layers Of Screeds, Perform New Layers In Accordance With The Design, Performance And Performance Of New Layers In Accordance With The Design, Performance And Performance Of New Layers In Accordance With The Design, Performance And Performance Supplementing The Plasters Of Kat Iii On The Walls, Making Aprons From Wall Tiles At The Sinks, Arrangement Of A Homogeneous Pvc Floor Covering In Renovated Rooms, Performing Plaster Coats On Walls And Ceilings, Assembly Of Owner Windscreen In Existing Pvc Windows, Cleaning And Painting Existing Concrete Window Sills, Replacement Of Ventilation Boxes, Assembly Of Ventilation Boxes, Assembly Of Ventilation Boxes, Mounting Ventilation Boxes, Installation Of Rollers Window Panels. On Existing Windows According To The Design, Emulsion And Oil Walls And Emulsion Ceilings. 2. Sanitary Installation: Demolition Works Include: Dismantling The Water Supply System, Dismantling Of Sanitary Sewage System. Construction And Installation Works Include: Assembly Of Cold Water Installations, Installation Of Hot Water Installations, Battery Installation, Washbasin Assembly, Assembly Of A New Sewage System Within The Renovated Rooms, Installation Of Cleaning, Assembly Of Thermal Insulation, Assembly Of Fans, Ventilation Ducts With Insulation. 3. Electrical Installation: Demolition Works Include: Dismantling Of Electrical Plug -In Sockets And Lighting, Disassembly Of Cable Channels On The Walls For Demolition, Dismantling Of Ict Cables, Along With Equipment, Making Furrows, Translate The Drilling Through The Walls And Ceilings Of The Building, Construction And Installation Works Include: Protecting The Foil Against The Destruction Of The Ict Installation, Equipment Equipment Computer Networks, Installation Of Cable Channels, Installation Slats, Floor Slats, Curtain Pipes, Laying Cables And Electrical Cables, Laying Ict Cables, Connecting Sockets And Plugins, Assembly Of The Hanging Cabinet Rack 19 9U, (Computer Networ
|