The Subject Of The Tender Procedure Is The Replacement Of The Existing Fittings Of The Bottom Of The Chańcza Water Reservoir Along With The Replacement Of Drives And The Execution Of Control Automation (Akpia). In Addition, The Existing Video Monitoring Network And Internal Electrical Installations Covering Additional Energy Consumption Points And Lighting Points Will Be Made. The Work Of The Works Includes: ꟷ Replacement Of The Existing Fittings On Bottom Triggers With Drive Replacement And Remote Control. Additional Sets Of Lifts For Flap Mounted On Ø600mm Triggers. ꟷ Project Of Additional Lighting Points And Supplying In The Zachw. ꟷ Replacement Of The Section Of The Pipeline Ø400mm Supplying The Fisheries Farm Pzw Ø400 Mm Pipeline With Replacement Of The Fittings With A New One. The Valves From The Upper And Lower Water Will Be Replaced, In The Case Of S4 And S7 Adjustment Triggers, Regeneration No. 7 And 13, Respectively. The Fittings Modernized During The Construction Of The Power Plant Is Not Covered By This Proceeding, I.E. The Bids 14 And 15. The Order Of The Contract Includes The Basic Contract And The Order Under The Options Law) The Subject Of The Basic Contract Is The Performance Of Preparatory Work, Modernization Of Bottom Triggers On The S1 Pipelines Dn 400, S2, S2, S4, S8 Modernization Of The Pipeline Pipeline Dn 100, B) The Order Under The Option Of The Option Includes The Modernization Of Bottom Triggers On Pipelines, S3, S5, S6, S7 And Modernization Of The Zduw Hall, Implementation Of Akpia Cctv Installation, Implementation Of The Electrical Installation. The Set Of The Contract And The Standards And Requirements Of Its Implementation Are Determined By The Documentation Of The Procedure, Including The Draft Contract Constituting An Attachment No. 1 To The Swz And Documentation, And Documentation Technical, I.E. Construction Design And Technical Specification Of The Execution And Acceptance Of Works Constituting Annex 2 To Swz. The Order Of The Contract Includes The Performance Of Specific Construction Works, Accompanying, Temporary Works And Resulting From The Specifics Of The Project, The Implementation Of Assembly Works And Delivery And Delivery And Fulfillment Of The Requirements Of The Task Specified By The Ordering Party, In Particular: A) Performing Construction Works And Other Activities Relevant Law, Including In The Field Of Occupational Health And Safety In Force In The Performance Of Construction Works And With The Principles Of Technical Knowledge, B) The Use Of Materials, Executive Techniques, Equipment, Diagnosis And Control Methods That Meet The Technical Requirements Placed In The Design Documentation And Technical Specification Of The Implementation And Acceptance Of Works, And The Materials Used Must Meet The Requirements Of The Act Of 16 April 2004 - On Construction Products, On Construction Products, As Well As The Requirements Of The Standards Referred To In The Content Of The Attachments To This Swz C) Mai
Contact Information
Address
Państwowe Gospodarstwo Wodne Wody Polskie,Warszawa,00-848,Mazowieckie,Pl911 - Miasto Warszawa
Email
krakow@wody.gov.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 93904482
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.