The Road Is Located In Czaple, The Pilgrimage Commune. The Road Length Is About 2.13 Km. The Road Runs Between The Inclusion In The Dw364 Provincial Road And Inclusion In Poviat Road No. 2518D (Direction Of Zakzynice). The Road Lane Consists Of A Roadway With A Bituminous Surface, Gravel And Bituminous Conventions, Stone Roadsides, Drainage Ditches, A Bus Bay With Gravel Surface And A Gravel Pavement. In Addition, There Are Elements Of Dehydration In The Form Of Culverts And Rain Gallery Along With Chefs. Within The Road Lane, There Are: Water Supply, Telethous, Energy And Rainwater. Stone Cube Surface, - Replacement Of Gravel Roadsides For The Side Of The Stone Aggregate And Stone Cube, - Renovation Of The Surface Of The Existing Gravel Pavement For The Surface Made Of Concrete Cubes, - Installation Of A Street Solar Lamp Within The Bus Bay, - Cleaning, Filming Of Ditches, Culvert Cleaning, - Assembly Of A New Energy Barrier Oblique Ending Of The Road Surface In The Scope Of: - Milling Of The Existing Bituminous Surface (An Average Thickness Of 8 Cm Was Assumed), - Alignment (Possible Profiling) Along With The Compaction Of The Existing Foundation, - Execution Of Earthworks And The Sub -Construction On The Expansion, - Execution Of A Layer From A Stone Aggregate With Compaction, - Perform A New Surface. Bituminous. Typical Layer Of The Road Surface Layers: - Ac11s Asphalt Lameline - 4 Cm, - Fiberglass Geosiat For Reinforcement Of Bituminous Surfaces With A Wipe. 120/120 Kn/M, - Interferatory Bond From Asphalt Emulsion With A Consumption Of 0.5 Kg/M2, - Ac16w Asphalt Concrete Binding Layer - 4 Cm, - Inter -Layer Bond With Asphalt Emulsion With A Consumption Of 0.8 Kg/M2, - Profile From The C90/3 Broken Stone -Stone -Stone Crus Cm. (Density Of Foundation E2 Min. 160Mpa). Surprising With Asphalt Concrete Surface, Bus Bay With Granite Cube Surface, Pavement Made Of Concrete Cubes, Roadside With Sections Made Of Granite Cubes, Asphalt Destructure. Details Of The Layer Structure In The Technical Documentation Attached To The Procedure. Surface Biłans: - Road Area - 10 895.00 M2, - Exit Area - 390.00 M2, - Roadside Area From Stone Cube - 495.0 M2, - Road Surface From Asphalt Destruct - 2520.00 M2, - Area Of The Bus Bay - 45.00 M2, - 38.00 M2, - Elevated Passage - 31.5 M2.
|