Mobilization And Demobilization Of Work In Urban Center, Supply And Placement Of Workplate In Galvanized Plate, Fixed Protection Siding To Close Metallic Tile, Tubing Tubular Metal Scaffolding, Assembly And Disassembly Tubular Tubing Tower (Exclusive Scaffolding And Cleaning), 12/03/2025, Parallelepiped, Removal And Resettlement Over Sand Cushion, Removal Of Ceramic And Fiber -Cement Tiles, Manually, Without Reuse, Partial/Total Removal Of Wood Plot, With/Without Reuse, Wood Reusing, With Less Than 8M, Mechanized, Reuse, Lining Removal, Wood Removal For Lining Or Galvanized Plate Conductor Removal Or Pvc, Including Removal, Removal Of Galvanized Or Pvc Gutter, Door Or Wooden Window Removal, Milestone, Manual Demolition Of Plastering, Ceramic Floor Or Hydraulic Tile Demolition, Ceramic Coating Demolition, Masonry Demolition, Ruffles Removal And Gallvanized Sheet, Luminaries, Removal, Removal Of Luminaires, Removal Of Electrical Switches/Sockets, Dishes And Accessories Removal, To Remove Sanitary Metals, Stone Bench Removal (Marble, Granite, Slate, Marble, Etc.), Manual Cemented Flooring Or Mortar Counterparts, Straight Plain Glass Removal With Wooden Baguette. Af_01/2021, Water Cash Removal, Demolished Bucket Material Transport, Exclusive, Curd Brick Masonry, Sidelines, Prefabricated Gessation Masonry, Prefabricated Lintel With Up To 1, 5 M, 10 * Cm Thickness, Stroke With Mortar, 3: 3 (Cement And Sand), Esp. 5Mm, Molding Or Single Mass In Mortar Trait 1: 2: 8, Manual Preparation, Cement And Sand Mortar Plaster, 1: 5 Trace, Stitching Stitching With Clamp Steel Bar Ø4, 2Mm, Wall 15 Cm 20 Mpa With Waterproofing Additive, Frame, Form, Deformation, Manufacture And Installation Of Non-Equipment, Supply And Installation, Supply And Installation Installation, Supply And Installation Of Counter-Chain In The Roof Structure, Subcobelitude With Plastic Blanket Coated With Aluminum Film, Roof With French Fitting, More Than 2 Water, Included Transportation And Ceramic Tile Pumps With Stroke, Ceramic Tile Wrapped With Mortar Stroke 1: 9, 9, Wood Lining, 9: 9 Exclusive Fixation Structure, Including Fixing And Transportation Structure To The Work, Lining Finishes (Frame Wheel). Angelim, Including Transportation To The Work, Subcovering With Plastic Blanket Coated With Aluminic Film, Drywall Ru Green Plasterboard 12, 5 X 1200 X 1800Mm, Including Installation, Trapezoidal Metal Tile Cover, Massive Concrete 10 Cm With Waterproof Additive, Galvanized Sheet, Esp. 0, 65Mm (Gsg-24), Rufo And Galvanized Plate Counter 0, 65Mm (Gsg-24), Rainwater Pipe Installation Service, Dn 135Mm, Pt4-Sewing Steel Steel Steel Tube, Medium Security, Broca Distance, Squad Clean Distance, Including (Metal Frames), Tilting Window Repair, Sanding Paint Removal, Gable Closure With Profile Frame, 2 X 2 Singer, Manual Door Or Window Removal Including Milestone And Alis
|