Labor - Workplate (For Civil Construction) In Galvanized Plate *N. 22*, Adhesive, Of*2, 4 X 1, 2*M, Workforce - Conventional Work Lease, Using Potched Boards Every 2.00M - 2 Uses. Af_03/2024, Labor - Manual Excavation For Crowning Blocks Or Shoe (Including Excavation For Shape Placement). Af_01/2024, Labor - Ballast With Granular Material (Crushed Stone 01 And 02), Applied To Floors Or Slabs On Soil, 10 Cm Thickness. Af_01/2024, Labor - Block Frame, Baldrame Beam Or Shoe Using 10Mm Ca -50 Steel - Assembly. Af_01/2024, Labor - Manufacture, Assembly And Disassembly Of Shape For Shoe, In Sawn Wood, And = 25 Mm, 02 Uses. Af_01/2024, Labor - Shoe Concreting, Fck 30 Mpa, Using A Bomb - Launch, Densification And Finishing. Af_01/2024, Labor - Surface Waterproofing With Asphalt Emulsion, 02 Coats. Af_09/2023, Labor - Baldrame Beam Manual Or Running Shoe (Including Excavation For Shape Placement). Af_01/2024, Labor - Pillar Frame Or Beam Of Conventional Reinforced Concrete Structure Using Ca -50 Steel Of 12, 5 Mm - Assembly. Af_06/2022, Labor - Pillar Frame Or Beam Of Conventional Reinforced Concrete Structure Using 5 Mm Ca -60 Steel - Assembly. Af_06/2022, Assembly And Disassembly Shaped For Baldrame Beam, Labor - Concreting Of Crown Block Or Beam Baldrame, Labor - Pillar Frame Or Conventional Beam Of Reinforced Concrete Using 10, 0 Mm - Assembly Steel. Af_06/2022, Labor - Shape Manufacture For Pillars And Similar Structures, With Sawn Wood, E = 25 Mm. Af_09/2020, Labor - Pillars Concreting, Fck = 30 Mpa, With Pump Use - Launch, Densification And Finishing. Af_02/2022_Ps, Labor - Conventional Concrete Structure Beam Frame Using Ca -50 Steel Of 10, Labor - Conventional Structure Structure Armado Structure Frame Using 5 Mm Ca -60 Steel - Assembly. Af_06/2022, Labor - Manufacturing For Beams, Labor - Conventional Precast Slab (Ceiling And Eaves) 9 Watermap), Labor - Dust -To -Treatment Pontalete - D: 8 To 11 Cm - Alt. Cm, Labor - Brick Masonry 6 Holes (Lifting And Platibands), Workforce - Molded In Loco, Concrete, For Windows Up To 1, 50 M, Labor Molded In Loco, With Van Of Up To 1, Wooden Structure - Labor - Aluzinc Coverage 0, 5 Mm, Square Of Steel. Galvanized No. 24, Cut 400 Cm, Labor - Pvc Tube, R -Series, Rainwater, 100 Mm Dn, Supplied And Installed In Vertical Conductors Of Rainwater. Af_12/2014, Labor - Wall Cover, Galvanized Steel, Workforce - Wall Chapisco/Internal/External/Slab 1: 3, Workforce For Inner Wall And Slab/Scratched Plaster External Walls 1: 2: 8, Workforce - Wall Plaster To Receive Ceramic 1: 2: 8, Work Hand - Ceramic Coating (Cup/Laundry/Sanitary), Hand Hand - Hand Stone Or Rachão Stone For Filling, Labor - Concrete Support - Cement: Sand: British (6 + 3 Cm), Workforce - Ceramic Flooring With Enameled Plates
|