1) The Subject Of The Contract Is The Execution Of Works Related To Partial Renovation Of The Bituminous Pavement Of Poviat Roads In The Sławno Poviat. The List Of Roads Intended For Partial Renovation Is Attached As Annex 3 To Swz. The Total Length Of Poviat Roads In The Sławno Poviat - 230.196 Km. As Part Of The Partial Renovation Of The Pavement, Surface Repairs Will Be Carried Out: Mineral And Bitumous Mass And An Asphalt Mixture (Emulsion - Grit). The Settlement Unit Of The Contract Will Be The Price For Built -In 1 Tonnes Of Mineral And Bituminous Mass And 1 Ton Of Asphalt (Emulsion And Grit). Estimated Amount Of Asphalt (Emulsion And Grits) Mixture For Building Into Poviat Roads In The Sławno Poviat In 2025 - 600 Tons. 2) The Estimated Amount Of Planned Works Is Used To Compare Submitted Offers And Calculate The Estimated Value Of The Order And Does Not Have To Be Used In Full. 3) A Detailed Description Of The Subject Of The Contract Was Indicated In The Detailed Technical Specification Constituting Annex 2 To Swz. 4) General Principles: The Scope Of Partial Renovation Includes: A) Partial Renovation With A Mineral And Bituminous Mass Surrounded By Hot - Preparatory And Measuring Works, Marking Of Works, Delivery Of Materials To The Works Area, Cleaning Damaged Places With A Sloping Of Patches With A Regular Shape, Removing The Rum To The Landfill, Leveling The Existing Foundation Of The Existing Foundation. Mechanically Concentrated, Sprinkling With A Binder Of The Bump And Spreading The Mineral And Bituminous Mixture In One Or Two Layers Depending On The Depth Of Damage While Maintaining The Road Level, Mechanical Density Of Individual Layers Of The Arranged Mixture. B) Partial Renovation With An Asphalt Mixture (Emulsion - Grit) - Preparatory And Measuring Works, Marking Of Works, Delivery Of Materials To The Area Of Works, Purification Of Damaged Places. The Contractor Is Obliged To Remove Road Damage That Threatens Road Safety And May Result In Traffic Damage Within A Maximum Of 24 Hours From The Time Of Telephone Notification; The Lack Of These Works Within 24 Hours May Result In The Contractors Civil Liability For Possible Damage To Vehicles. C) The Contractor Is Obliged On Non -Working Days (Saturdays, Sundays And Holidays) And On Weekdays From 15:30 To 7:30 For Emergency Protection Of Road Damage That Threatens Road Safety, Asphalt Mass, Traffic Safety Devices Such As Road Barriers, Roadsters, Tapes, Etc., Reported By Order Services, E.G. Police, Municipal Guard, Etc.; The Contractor Will Be Informed About The Fact That The Employer Will Be Informed About The Fact Of Damage Threatening Traffic Safety. The Response Time Should Not Exceed 4 Hours From The Moment Of Notification. A Photographic Documentation Should Be Prepared From The Fact Of Protecting Damage, Including A Placed Or Marked Place Before And After Works, Which Should Be Delivered To The Road Manager At The Shortest Possible Date. The Lack Of These Works Within A Spe
Contact Information
Address
Powiat Sławieński,Sławno,76-100,Zachodniopomorskie,Pl426 - Koszaliński
Email
e.sokolowska@powiatslawno.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 93789457
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.