3 West Pomeranian, Along With The Development Of The Area And The Necessary Technical Infrastructure, As Well As Obtaining On Behalf Of The Contracting Authority Of A Final Use Permit. The Construction Of Construction Works Includes: 1) Construction Of A Keyboard Administrative Building - A One -Story Building, Non -Basement, Founded On A Foundation Plate, Made In A Wooden Skeleton Technology With C24 Wood Two -State Symmetrical, Hood, With A Corner Of The Slope 35˚ - Along With Finishing Works, Without Equipping The Rooms With Furniture And Office Equipment. 2) Construction Of Connections: Water Supply, Sewage, Electricity, Telecommunications. Lighting, Grounding, Lightning, Teletechnical, Monitoring, Fire -Fighting, Photovoltaic Warning. 4) As Part Of The Accompanying Infrastructure Full Concrete Surface, Dustbin Cover From Fence Panels With A System Gate. A Detailed Description Of The Subject Of The Contract Is Included In Annex 1 To Swz, I.E. In The Design Documentation Containing: 1) Land Development Project - Volume I - Constituting Annex 1A To Swz; 2) Architectural And Construction Design - Volume Ii - Constituting Annex 1B To Swz; 3) Technical Project - Volume Iii And Acceptance Of Works - Constituting Annex 1D To Swz; 5) Interior Design Project In The Field Of Walls, Tiles, Floors, Window And Door Joinery - Constituting Annex 1E To Swz; 6) Works - The Contracting Authority Informs That The Entries Attached To Swz Do Not Determine The Scope Of The Contract. The Contractor Should Verify And Determine Whether It Is Necessary To Perform Other Construction Works Than Those Specified In The Daily Works And Whether The Quantities Given Are Correct. The Contractor Is Obliged To Conclude In The Price Of All Costs For The Works Necessary For The Proper Performance Of The Contract, In Accordance With The Works Technology Specified In Swz And In The Documents Attached To Swz Describing The Subject Of The Contract. The Values Are Informative And Auxiliary In The Price Calculation Of The Offer - Constituting Annex 1F To Swz; 7) Land Research - Geotechnical Opinion - Constituting Annex 1G To Swz; 8) Formal Documents Constituting Annex No. 1H To Swz, Including: A) Decision No. 646/2024 Of 30.10.2024 Approving The Construction Project And Granting Building Permits For The Construction Pgl Lp Forest District Of Goleniów, A Detached Administrative Building Together With Installations: Water Supply, Sanitary And Electrical Sewage System On Plot 67/24, Geodetic Area Of Zielonczyn, Stepnica Commune (Known In: 6740.631.02.2024.Mc No. 24761); B) Decision Of 11.09.2024 Location In The Road Lane Of Voivodship Road No. 111 In Zielonczyn (Plot No. 192, 67/230) Of The Device In The Form Of A Water Connection (Kn. Z O.O. Of 05.07.2024 (Known In: 32816/2024/Od3/Zr3); D) Terms Of Connection To The Water Supply And Sewage Network Issued By Wodociągi Zachodniopomorskie Sp. Z O.O. Of 25.07.2024 (Known By Spr.: Wz/Te/2010/4097/2024/Md); E) Agreement Of The Sanitary Sew
Contact Information
Address
Skarb Państwa Państwowe Gospodarstwo Leśne Lasy Państwowe Nadleśnictwo Goleniów,Goleniów,72-100,Zachodniopomorskie,Pl428 - Szczeciński
Contact No.
+48914182459
Email
goleniow@szczecin.lasy.gov.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 93789401
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.